United States βΊ Grid βΊ Interconnection queues βΊ North Carolina
SOLAR Β· PJMFive Forks Solar
Five Forks Solar is a 20.0 MW solar request withdrawn in the PJM interconnection queue, in Warren County, North Carolina, connecting to Dominion.
Queue statusWithdrawn / abandoned
- PlanningQueued Apr 2015 (completed)
- Withdrawn / abandonedApr 2018 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- AA2-169
- Grid region
- PJM (Mid-Atlantic, Midwest)
- Utility / transmission owner
- Dominion
- Connection point (POI)
- Five Forks 115kV
- Location
- Warren County, North Carolina
- Technology
- Solar: 20.0 MW
- Total requested
- 20.0 MW
- Service type
- Network resource (NRIS)
- Study phase
- Available studies: Feasibility Study, System Impact Study, Facilities Study; Interim/Interconnection Service Agreement:
- Queue status
- Withdrawn
- Entered queue
- 30 April 2015
- Proposed online date
- August 2018
- Withdrawn
- April 2018
Location
Marker shows the centre of Warren County; the queue data does not give exact sites.
Power plants in North Carolina Β· Transmission lines in North Carolina
Other requests in Warren County
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem