OCTARY USA · INTERCONNECTION QUEUESWithdrawn queue requests in CAISO (California) — page 31
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| Sweetbrier Hybrid Solar Solar + storage |
90.8 MW | Withdrawn / abandoned |
| Green Borders Geothermal Phase II Geothermal |
90.0 MW | Withdrawn / abandoned |
| Magnolia Solar Farm Solar |
90.0 MW | Withdrawn / abandoned |
| Falcon Palm Energy Center Battery storage |
90.0 MW | Withdrawn / abandoned |
| High Desert Solar PV Solar |
90.0 MW | Withdrawn / abandoned |
| Mallard Energy Storage Project Battery storage |
90.0 MW | Withdrawn / abandoned |
| Kama 3 FPV Solar + storage |
87.8 MW | Withdrawn / abandoned |
| Pahrump Solar Solar |
87.5 MW | Withdrawn / abandoned |
| Desert Flower Wind Farm Onshore wind |
86.4 MW | Withdrawn / abandoned |
| DRY Creek (Fka Jasmin Power 3) Gas |
86.0 MW | Withdrawn / abandoned |
| Jordan II Renewable Power Project (20/66MW) Other |
86.0 MW | Withdrawn / abandoned |
| Ridgeview Energy Storage Battery storage |
85.0 MW | Withdrawn / abandoned |
| Watson Cogeneration Gas |
85.0 MW | Withdrawn / abandoned |
| Juniper Hybrid Solar + storage |
84.0 MW | Withdrawn / abandoned |
| Sonora Solar Generating Station Solar |
84.0 MW | Withdrawn / abandoned |
| Bonsall Renewable Solar + storage |
84.0 MW | Withdrawn / abandoned |
| Heirloom Renewable Solar + storage |
84.0 MW | Withdrawn / abandoned |
| Sagebrush Solar 1 Solar |
83.3 MW | Withdrawn / abandoned |
| Sanyo Ave Storage 1 Battery storage |
82.6 MW | Withdrawn / abandoned |
| Hydaspes Solar + storage |
82.0 MW | Withdrawn / abandoned |
| Dos Amigos Solar Solar |
81.8 MW | Withdrawn / abandoned |
| Helix Storage Battery storage |
81.6 MW | Withdrawn / abandoned |
| SEGS10 Solar Solar |
81.4 MW | Withdrawn / abandoned |
| Bluegill Storage Battery storage |
81.4 MW | Withdrawn / abandoned |
| Plaugher Ranch Solar Solar + storage |
81.0 MW | Withdrawn / abandoned |
| Vickers Energy Storage Battery storage |
80.0 MW | Withdrawn / abandoned |
| Basket Ridge Solar Solar |
80.0 MW | Withdrawn / abandoned |
| Voyager Solar Energy Solar |
80.0 MW | Withdrawn / abandoned |
| Hdla Solar Solar |
80.0 MW | Withdrawn / abandoned |
| PV-31 Solar |
80.0 MW | Withdrawn / abandoned |
| Solcen Solar Project Solar |
80.0 MW | Withdrawn / abandoned |
| Mesa Verde Solar Solar |
80.0 MW | Withdrawn / abandoned |
| Belridge Solar Energy 2 Project Solar |
80.0 MW | Withdrawn / abandoned |
| Solano Solar Solar |
80.0 MW | Withdrawn / abandoned |
| Highway 58 Solar Energy Project Solar |
80.0 MW | Withdrawn / abandoned |
| Newhall Solar Energy Project Solar |
80.0 MW | Withdrawn / abandoned |
| KM Acquisitions Solar |
80.0 MW | Withdrawn / abandoned |
| Alpine Storage Battery storage |
79.5 MW | Withdrawn / abandoned |
| Windy Wash Solar Solar |
79.0 MW | Withdrawn / abandoned |
| Elkhorn Expansion Battery storage |
78.6 MW | Withdrawn / abandoned |
| Coso Solar 1 Solar |
78.2 MW | Withdrawn / abandoned |
| Mooncrest Battery storage |
78.0 MW | Withdrawn / abandoned |
| Chamise Solar + storage |
77.7 MW | Withdrawn / abandoned |
| Cassiopeia Solar Solar |
77.0 MW | Withdrawn / abandoned |
| Polvadero Hybrid Solar Solar + storage |
76.9 MW | Withdrawn / abandoned |
| Breckenridge Battery storage |
76.5 MW | Withdrawn / abandoned |
| Gonzaga Ridge Wind Farm 3 Onshore wind |
76.0 MW | Withdrawn / abandoned |
| Cleanpower Solar Solar + storage |
75.4 MW | Withdrawn / abandoned |
| Yuha Basin Solar Solar |
75.0 MW | Withdrawn / abandoned |
| Riviera Solar Solar |
75.0 MW | Withdrawn / abandoned |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
- West (non-ISO utilities)5,277 · 949.5 GW
- PJM (Mid-Atlantic, Midwest)5,226 · 638.1 GW
- MISO (Midcontinent)3,261 · 621.9 GW
- CAISO (California)2,186 · 619.9 GW
- Southeast (non-ISO utilities)2,738 · 603.3 GW
- SPP (Southwest Power Pool)1,846 · 382.9 GW
- NYISO (New York)1,531 · 324.1 GW
- ERCOT (Texas)1,158 · 262.0 GW
- ISO-NE (New England)982 · 118.1 GW
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines · Planned power plants (EIA)