Magnolia Solar Farm

Magnolia Solar Farm is a 90.0 MW solar request withdrawn in the CAISO interconnection queue, in Fresno County, California, connecting to PGAE.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Mar 2011 (completed)
  2. Withdrawn / abandonedFeb 2013 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
725
Grid region
CAISO (California)
Utility / transmission owner
PGAE
Connection point (POI)
Hammond Sub 115 KV
Location
Fresno County, California
Technology
Solar: 90.0 MW
Total requested
90.0 MW
Service type
Network resource (NRIS)
Study phase
System Impact Study
Queue status
Withdrawn
Entered queue
31 March 2011
Proposed online date
July 2014
Withdrawn
February 2013

Location

Marker shows the centre of Fresno County; the queue data does not give exact sites.