PV-31 is a 80.0 MW solar request withdrawn in the CAISO interconnection queue, in San Bernardino County, California, connecting to SCE.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Apr 2008 (completed)
  2. Withdrawn / abandonedJul 2010 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
350
Grid region
CAISO (California)
Utility / transmission owner
SCE
Connection point (POI)
Eldorado-Baker- Coolwater-Dunn Siding-Mountain Pass 115 kV line
Location
San Bernardino County, California
Technology
Solar: 80.0 MW
Total requested
80.0 MW
Study phase
System Impact Study
Queue status
Withdrawn
Entered queue
25 April 2008
Proposed online date
May 2013
Withdrawn
July 2010

Location

Marker shows the centre of San Bernardino County; the queue data does not give exact sites.

Power plants in California Β· Transmission lines in California

Other requests in San Bernardino County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem