Chamise

Chamise is a 77.7 MW solar + storage request withdrawn in the CAISO interconnection queue, in Kern County, California, connecting to PGAE.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Apr 2019 (completed)
  2. Withdrawn / abandonedAug 2023 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
1591
Grid region
CAISO (California)
Utility / transmission owner
PGAE
Connection point (POI)
Midway-Tupman-Rio Bravo-Renfro 115 kV
Location
Kern County, California
Technology
Solar: 55.9 MW Β· Battery: 21.8 MW
Total requested
77.7 MW
Service type
Energy only (ERIS)
Study phase
In Progress
Queue status
Withdrawn
Entered queue
15 April 2019
Proposed online date
December 2024
Withdrawn
August 2023

Location

Marker shows the centre of Kern County; the queue data does not give exact sites.