Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| PV Del Sur-Lancaster Solar |
100 MW | Withdrawn / abandoned |
| PV-11 (Fka PV Rosamond-Del Sur) Solar |
100 MW | Withdrawn / abandoned |
| Kroe Hybrid Solar + storage |
100 MW | Withdrawn / abandoned |
| Bear River Wind Farm Onshore wind |
100 MW | Withdrawn / abandoned |
| Los Robles Solar |
100 MW | Withdrawn / abandoned |
| PV-41 Solar |
100 MW | Withdrawn / abandoned |
| Pacheco Wind Onshore wind |
100 MW | Withdrawn / abandoned |
| Tesla Solar Farm Solar |
100 MW | Withdrawn / abandoned |
| Quail Brush Power Project (Fka San Diego Community Power Project 2) Gas |
100 MW | Withdrawn / abandoned |
| Alta 9 Onshore wind |
100 MW | Withdrawn / abandoned |
| PV Palmdale-Rockair Solar |
100 MW | Withdrawn / abandoned |
| Mcgrath Energy Center 1 Battery storage |
100 MW | Withdrawn / abandoned |
| PV-43 Solar |
100 MW | Withdrawn / abandoned |
| Dorado Energy Storage Battery storage |
100 MW | Withdrawn / abandoned |
| Keyhole Wind 2 Onshore wind |
100 MW | Withdrawn / abandoned |
| Kimberlina Solar Solar |
100 MW | Withdrawn / abandoned |
| Fresno Solar Solar |
100 MW | Withdrawn / abandoned |
| Willow Solar Solar |
100 MW | Withdrawn / abandoned |
| White Wolf Solar Solar |
100 MW | Withdrawn / abandoned |
| Juniper Solar Farm Solar |
100 MW | Withdrawn / abandoned |
| PV-3 (Fka PV Antelope-Del Sur) Solar |
100 MW | Withdrawn / abandoned |
| PV-46 Solar |
100 MW | Withdrawn / abandoned |
| Wellhead Power Lathrop Gas |
99.9 MW | Withdrawn / abandoned |
| Margarita Energy Center Gas |
99.0 MW | Withdrawn / abandoned |
| WP Pendleton Gas |
99.0 MW | Withdrawn / abandoned |
| Pala Energy Center Gas |
99.0 MW | Withdrawn / abandoned |
| Border II Gas |
99.0 MW | Withdrawn / abandoned |
| WP Fallbrook Gas |
99.0 MW | Withdrawn / abandoned |
| DGC Kelso Re Gas |
99.0 MW | Withdrawn / abandoned |
| Mareste BESS Battery storage |
99.0 MW | Withdrawn / abandoned |
| GWF Hanford Gas |
99.0 MW | Withdrawn / abandoned |
| Ramco Energy Center Gas |
99.0 MW | Withdrawn / abandoned |
| Montezuma II Expansion Onshore wind |
98.9 MW | Withdrawn / abandoned |
| Olympus Power Gas |
98.8 MW | Withdrawn / abandoned |
| Lonestar Gas |
98.8 MW | Withdrawn / abandoned |
| Oceanside Gas |
98.8 MW | Withdrawn / abandoned |
| Stevinson Solar + storage |
98.8 MW | Withdrawn / abandoned |
| Henrietta II Gas |
97.2 MW | Withdrawn / abandoned |
| Alamo Springs Solar 2 Solar + storage |
96.0 MW | Withdrawn / abandoned |
| Beowulf Energy Storage Battery storage |
95.8 MW | Withdrawn / abandoned |
| Coso 2 Swap (Coso Finance Partners) Geothermal |
95.0 MW | Withdrawn / abandoned |
| Wilbur Energy Storage Battery storage |
94.5 MW | Withdrawn / abandoned |
| South Kern Front Cogen Gas |
94.0 MW | Withdrawn / abandoned |
| MMC Chula Vista Expansion Gas |
93.0 MW | Withdrawn / abandoned |
| Fallbrook Rosamond Suntower Solar |
92.6 MW | Withdrawn / abandoned |
| Calloway BESS Battery storage |
92.1 MW | Withdrawn / abandoned |
| Jewel Valley Project (Fka Jordan Wind Power) Onshore wind |
92.0 MW | Withdrawn / abandoned |
| Nevada Solar II (NS2) Solar |
92.0 MW | Withdrawn / abandoned |
| Celestial Solar 1 Solar |
91.7 MW | Withdrawn / abandoned |
| Van Kleef Gas |
91.0 MW | Withdrawn / abandoned |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
- West (non-ISO utilities)5,277 · 949.5 GW
- PJM (Mid-Atlantic, Midwest)5,226 · 638.1 GW
- MISO (Midcontinent)3,261 · 621.9 GW
- CAISO (California)2,186 · 619.9 GW
- Southeast (non-ISO utilities)2,738 · 603.3 GW
- SPP (Southwest Power Pool)1,846 · 382.9 GW
- NYISO (New York)1,531 · 324.1 GW
- ERCOT (Texas)1,158 · 262.0 GW
- ISO-NE (New England)982 · 118.1 GW
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines · Planned power plants (EIA)