Withdrawn queue requests in CAISO (California) — page 30

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown2,186619.9 GW
Active in queue188.6 GW429 requests
Agreement signed96.2 GW235 requests
Withdrawn2,186619.9 GW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

2,186 requests · page 30 of 44
ProjectCapacityStatusLocationRegionQueuedOnline
PV Del Sur-Lancaster
Solar
100 MWWithdrawn / abandoned Los Angeles, CACAISO Mar 2008target 2009
PV-11 (Fka PV Rosamond-Del Sur)
Solar
100 MWWithdrawn / abandoned Los Angeles, CACAISO Mar 2008target 2013
Kroe Hybrid
Solar + storage
100 MWWithdrawn / abandoned Merced, CACAISO May 2017target 2019
Bear River Wind Farm
Onshore wind
100 MWWithdrawn / abandoned Humboldt, CACAISO May 2006target 2009
Los Robles
Solar
100 MWWithdrawn / abandoned San Diego, CACAISO Apr 2012target 2015
PV-41
Solar
100 MWWithdrawn / abandoned San Luis Obispo, CACAISO Apr 2008target 2011
Pacheco Wind
Onshore wind
100 MWWithdrawn / abandoned Merced, CACAISO Feb 2007target 2011
Tesla Solar Farm
Solar
100 MWWithdrawn / abandoned San Joaquin, CACAISO Mar 2011target 2014
Quail Brush Power Project (Fka San Diego Community Power Project 2)
Gas
100 MWWithdrawn / abandoned San Diego, CACAISO Feb 2010target 2017
Alta 9
Onshore wind
100 MWWithdrawn / abandoned Kern, CACAISO Dec 2006target 2013
PV Palmdale-Rockair
Solar
100 MWWithdrawn / abandoned Los Angeles, CACAISO Mar 2008target 2009
Mcgrath Energy Center 1
Battery storage
100 MWWithdrawn / abandoned Ventura, CACAISO Apr 2018target 2020
PV-43
Solar
100 MWWithdrawn / abandoned Kern, CACAISO Apr 2008target 2013
Dorado Energy Storage
Battery storage
100 MWWithdrawn / abandoned San Diego, CACAISO May 2016target 2019
Keyhole Wind 2
Onshore wind
100 MWWithdrawn / abandoned Kern, CACAISO Apr 2020target 2024
Kimberlina Solar
Solar
100 MWWithdrawn / abandoned Kern, CACAISO Apr 2015target 2018
Fresno Solar
Solar
100 MWWithdrawn / abandoned Fresno, CACAISO Mar 2011target 2014
Willow Solar
Solar
100 MWWithdrawn / abandoned Kern, CACAISO Mar 2011target 2016
White Wolf Solar
Solar
100 MWWithdrawn / abandoned Kern, CACAISO Apr 2015target 2020
Juniper Solar Farm
Solar
100 MWWithdrawn / abandoned Riverside, CACAISO Mar 2011target 2014
PV-3 (Fka PV Antelope-Del Sur)
Solar
100 MWWithdrawn / abandoned Los Angeles, CACAISO Mar 2008target 2013
PV-46
Solar
100 MWWithdrawn / abandoned Kern, CACAISO Apr 2008target 2011
Wellhead Power Lathrop
Gas
99.9 MWWithdrawn / abandoned Stanislaus, CACAISO Nov 2004target 2006
Margarita Energy Center
Gas
99.0 MWWithdrawn / abandoned Orange, CACAISO Aug 2006target 2008
WP Pendleton
Gas
99.0 MWWithdrawn / abandoned San Diego, CACAISO Apr 2013target 2016
Pala Energy Center
Gas
99.0 MWWithdrawn / abandoned San Diego, CACAISO Aug 2006target 2008
Border II
Gas
99.0 MWWithdrawn / abandoned San Diego, CACAISO May 2007target 2010
WP Fallbrook
Gas
99.0 MWWithdrawn / abandoned San Diego, CACAISO Apr 2013target 2016
DGC Kelso Re
Gas
99.0 MWWithdrawn / abandoned Alameda, CACAISO Apr 2008target 2012
Mareste BESS
Battery storage
99.0 MWWithdrawn / abandoned Alameda, CACAISO Apr 2019target 2023
GWF Hanford
Gas
99.0 MWWithdrawn / abandoned Kings, CACAISO Nov 2007target 2010
Ramco Energy Center
Gas
99.0 MWWithdrawn / abandoned San Diego, CACAISO Jun 2007target 2010
Montezuma II Expansion
Onshore wind
98.9 MWWithdrawn / abandoned Solano, CACAISO Jul 2009target 2014
Olympus Power
Gas
98.8 MWWithdrawn / abandoned San Diego, CACAISO May 2007target 2010
Lonestar
Gas
98.8 MWWithdrawn / abandoned San Diego, CACAISO May 2007target 2010
Oceanside
Gas
98.8 MWWithdrawn / abandoned San Diego, CACAISO May 2007target 2010
Stevinson
Solar + storage
98.8 MWWithdrawn / abandoned Merced, CACAISO Apr 2019target 2023
Henrietta II
Gas
97.2 MWWithdrawn / abandoned Kings, CACAISO Mar 2005target 2008
Alamo Springs Solar 2
Solar + storage
96.0 MWWithdrawn / abandoned Kern, CACAISO Apr 2015target 2023
Beowulf Energy Storage
Battery storage
95.8 MWWithdrawn / abandoned Santa Clara, CACAISO Apr 2021target 2034
Coso 2 Swap (Coso Finance Partners)
Geothermal
95.0 MWWithdrawn / abandoned Inyo, CACAISO Jul 2010target 2012
Wilbur Energy Storage
Battery storage
94.5 MWWithdrawn / abandoned Contra Costa, CACAISO May 2017target 2023
South Kern Front Cogen
Gas
94.0 MWWithdrawn / abandoned Kern, CACAISO Mar 2005target 2015
MMC Chula Vista Expansion
Gas
93.0 MWWithdrawn / abandoned San Diego, CACAISO Feb 2006target 2009
Fallbrook Rosamond Suntower
Solar
92.6 MWWithdrawn / abandoned Kern, CACAISO Jul 2009target 2012
Calloway BESS
Battery storage
92.1 MWWithdrawn / abandoned Kern, CACAISO Apr 2021target 2029
Jewel Valley Project (Fka Jordan Wind Power)
Onshore wind
92.0 MWWithdrawn / abandoned San Diego, CACAISO Feb 2010target 2014
Nevada Solar II (NS2)
Solar
92.0 MWWithdrawn / abandoned Clark, NVCAISO Jul 2009target 2012
Celestial Solar 1
Solar
91.7 MWWithdrawn / abandoned Kern, CACAISO May 2016target 2020
Van Kleef
Gas
91.0 MWWithdrawn / abandoned CACAISO Apr 2023target 2026
Page 30 of 44

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines · Planned power plants (EIA)