PV-41

PV-41 is a 100 MW solar request withdrawn in the CAISO interconnection queue, in San Luis Obispo County, California, connecting to PGAE.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Apr 2008 (completed)
  2. Withdrawn / abandonedNov 2008 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
355
Grid region
CAISO (California)
Utility / transmission owner
PGAE
Connection point (POI)
San Luis Obispo-Tremblor 115kV line
Location
San Luis Obispo County, California
Technology
Solar: 100 MW
Total requested
100 MW
Study phase
System Impact Study
Queue status
Withdrawn
Entered queue
28 April 2008
Proposed online date
May 2011
Withdrawn
November 2008

Location

Marker shows the centre of San Luis Obispo County; the queue data does not give exact sites.

Power plants in California Β· Transmission lines in California

Other requests in San Luis Obispo County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem