πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content

United States β€Ί Grid β€Ί Interconnection queues β€Ί California

SOLAR Β· CAISO

PV-46

PV-46 is a 100 MW solar request withdrawn in the CAISO interconnection queue, in Kern County, California, connecting to PGAE.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Apr 2008 (completed)
  2. Withdrawn / abandonedNov 2008 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
358
Grid region
CAISO (California)
Utility / transmission owner
PGAE
Connection point (POI)
Midway Sunset via Midway-Sunset Gen-Tie 230 kV line
Location
Kern County, California
Technology
Solar: 100 MW
Total requested
100 MW
Study phase
System Impact Study
Queue status
Withdrawn
Entered queue
30 April 2008
Proposed online date
May 2011
Withdrawn
November 2008

Location

Marker shows the centre of Kern County; the queue data does not give exact sites.

Power plants in California Β· Transmission lines in California

Other requests in Kern County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem