Border II

Border II is a 99.0 MW gas request withdrawn in the CAISO interconnection queue, in San Diego County, California, connecting to SDGE.

Queue statusWithdrawn / abandoned
  1. PlanningQueued May 2007 (completed)
  2. Withdrawn / abandonedJul 2007 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
224
Grid region
CAISO (California)
Utility / transmission owner
SDGE
Connection point (POI)
69kV line next to Calpeak Border site
Location
San Diego County, California
Technology
Gas: 99.0 MW
Total requested
99.0 MW
Study phase
System Impact Study
Queue status
Withdrawn
Entered queue
30 May 2007
Proposed online date
May 2010
Withdrawn
July 2007

Location

Marker shows the centre of San Diego County; the queue data does not give exact sites.

Power plants in California Β· Transmission lines in California

Other requests in San Diego County