DGC Kelso Re

DGC Kelso Re is a 99.0 MW gas request withdrawn in the CAISO interconnection queue, in Alameda County, California, connecting to PGAE.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Apr 2008 (completed)
  2. Withdrawn / abandonedMay 2008 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
335
Grid region
CAISO (California)
Utility / transmission owner
PGAE
Connection point (POI)
Kelso Substation 230kV bus
Location
Alameda County, California
Technology
Gas: 99.0 MW
Total requested
99.0 MW
Study phase
System Impact Study
Queue status
Withdrawn
Entered queue
4 April 2008
Proposed online date
June 2012
Withdrawn
May 2008

Location

Marker shows the centre of Alameda County; the queue data does not give exact sites.

Power plants in California Β· Transmission lines in California

Other requests in Alameda County