United States β€Ί Grid β€Ί Interconnection queues β€Ί California

GAS Β· CAISO

Margarita Energy Center

Margarita Energy Center is a 99.0 MW gas request withdrawn in the CAISO interconnection queue, in Orange County, California, connecting to SDGE.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Aug 2006 (completed)
  2. Withdrawn / abandonedJan 2007 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
122
Grid region
CAISO (California)
Utility / transmission owner
SDGE
Connection point (POI)
SDG&E Margarita Substation
Location
Orange County, California
Technology
Gas: 99.0 MW
Total requested
99.0 MW
Study phase
System Impact Study
Queue status
Withdrawn
Entered queue
17 August 2006
Proposed online date
June 2008
Withdrawn
January 2007

Location

Marker shows the centre of Orange County; the queue data does not give exact sites.

Power plants in California Β· Transmission lines in California

Other requests in Orange County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem