ONSHORE WIND Β· CAISO

Pacheco Wind

Pacheco Wind is a 100 MW onshore wind request withdrawn in the CAISO interconnection queue, in Merced County, California, connecting to PGAE.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Feb 2007 (completed)
  2. Withdrawn / abandonedNov 2007 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
178
Grid region
CAISO (California)
Utility / transmission owner
PGAE
Connection point (POI)
Los Banos 230kV bus near Pacheco Pass
Location
Merced County, California
Technology
Wind: 100 MW
Total requested
100 MW
Study phase
System Impact Study
Queue status
Withdrawn
Entered queue
28 February 2007
Proposed online date
December 2011
Withdrawn
November 2007

Location

Marker shows the centre of Merced County; the queue data does not give exact sites.

Power plants in California Β· Transmission lines in California

Other requests in Merced County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem