United States › Grid › Interconnection queues › California

ONSHORE WIND · CAISO

Jewel Valley Project (Fka Jordan Wind Power)

Jewel Valley Project (Fka Jordan Wind Power) is a 92.0 MW onshore wind request withdrawn in the CAISO interconnection queue, in San Diego County, California, connecting to SDGE.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Feb 2010 (completed)
  2. Withdrawn / abandonedOct 2011 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
555
Grid region
CAISO (California)
Utility / transmission owner
SDGE
Connection point (POI)
Boulevard Substation 138kV
Location
San Diego County, California
Technology
Wind: 92.0 MW
Total requested
92.0 MW
Service type
Network resource (NRIS)
Study phase
System Impact Study
Queue status
Withdrawn
Entered queue
1 February 2010
Proposed online date
December 2014
Withdrawn
October 2011

Location

Marker shows the centre of San Diego County; the queue data does not give exact sites.

Power plants in California · Transmission lines in California

Other requests in San Diego County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem