Mareste BESS

Mareste BESS is a 99.0 MW battery storage request withdrawn in the CAISO interconnection queue, in Alameda County, California, connecting to PGAE.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Apr 2019 (completed)
  2. Withdrawn / abandonedApr 2020 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
1545
Grid region
CAISO (California)
Utility / transmission owner
PGAE
Connection point (POI)
Grant Eastshore #1 115kV
Location
Alameda County, California
Technology
Battery: 99.0 MW
Total requested
99.0 MW
Service type
Network resource (NRIS)
Study phase
Feasibility Study
Queue status
Withdrawn
Entered queue
15 April 2019
Proposed online date
May 2023
Withdrawn
April 2020

Location

Marker shows the centre of Alameda County; the queue data does not give exact sites.