United States › Grid › Interconnection queues
OCTARY USA · INTERCONNECTION QUEUESInterconnection queue in ERCOT (Texas) (2025 requests) — page 3
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| Juanita Creek BESS Battery storage · Juanita Creek Energy Center, LLC |
304 MW | In study |
| Goat Mountain Wind-Repower Wind + storage · Goat Wind LLC |
303 MW | In study |
| Prairie Power Wind Onshore wind · Prairie Power Wind, LLC |
303 MW | In study |
| Live Oak Wind II Onshore wind · ENGIE IR Holdings LLC |
303 MW | In study |
| Spurland Solar I Solar · Spurland Solar I |
302 MW | In study |
| Outrider BESS Battery storage · Sanders Hollow Energy Center, LLC |
302 MW | In study |
| Dry Creek Solar II Solar · Oak Hill Solar II LLC |
302 MW | In study |
| Badger Solar Solar + storage · 174 Power Global Properties, LLC |
302 MW | In study |
| Dairyland Storage Battery storage · ENGIE IR Holdings LLC |
302 MW | In study |
| Cazadores Solar Solar · OCI Energy LLC |
302 MW | In study |
| Soluce Bravo Storage Solar + storage · BNPB1, LLC |
302 MW | In study |
| Galaxy Solar 2 Solar · Galaxy Solar 2, LLC |
302 MW | In study |
| Simsboro Storage Battery storage · Simsboro Storage LLC |
302 MW | In study |
| Gulf Gateway Storage One Solar + storage · Gulf Gateway Storage, LLC |
301 MW | In study |
| Gulf Gateway Solar One Solar + storage · Gulf Gateway Solar, LLC |
301 MW | In study |
| Cenizo Solar Solar · Renew Development Holdco, LLC |
301 MW | In study |
| Cernan BESS Battery storage · Scarlet BESS LLC |
301 MW | In study |
| Sweetheart Solar Solar + storage · Sweetheart Energy, LLC |
301 MW | In study |
| Prairie Branch Solar Solar + storage · Prairie Branch Solar |
301 MW | In study |
| Blue Spring Solar Solar · Flat Creek Solar, LLC |
301 MW | In study |
| Sundance Solar Solar · Sundance Solar, LLC |
301 MW | In study |
| Apricot Sun Storage Solar + storage · Apricot Sun Energy Center, LLC |
301 MW | In study |
| Barranca Wind 1 Onshore wind · Barranca Wind Energy, LLC |
301 MW | In study |
| Bendito Wind Onshore wind · Bendito Wind Farm, LLC |
300 MW | In study |
| Selenite Springs Solar Solar · Selenite Springs Solar, LLC |
300 MW | In study |
| Wisdom Solar SLF Solar + storage · Wisdom Green Energy LLC |
299 MW | In study |
| Barranca Wind 2 Onshore wind · Barranca Wind Energy, LLC |
299 MW | In study |
| Columbine Wind Onshore wind · Wilson Wind LLC |
295 MW | In study |
| Vista Bluff Wind II "Alternate POI" Onshore wind · Vista Bluff Windpower, LLC |
290 MW | In study |
| Vista Bluff Wind I "Alternate POI" Onshore wind · Vista Bluff Windpower, LLC |
290 MW | In study |
| Baker Branch BESS Battery storage · Mockingbird Storage Center, LLC |
287 MW | In study |
| Fivemile Wind Onshore wind · Longview Wind, LLC |
282 MW | In study |
| Treehouse Solar Solar + storage · Treehouse Solar, LLC |
282 MW | In study |
| Jukebox Solar Solar · ACE DevCo NC, LLC |
281 MW | In study |
| Pease River Solar Solar · Pease River Solar LLC |
276 MW | In study |
| Roboman Solar Solar · Roboman Solar, LLC |
273 MW | In study |
| Velociraptor BESS II Solar + storage · Greyhound BESS 3 LLC |
261 MW | In study |
| Velociraptor BESS I Solar + storage · Greyhound BESS 2 LLC |
261 MW | In study |
| Jay Flat BESS Battery storage · Jay Flat BESS LLC |
259 MW | In study |
| Horsepower BESS Battery storage · Horsepower BESS, LLC |
258 MW | In study |
| San Gabriel Solar Solar + storage · San Gabriel Solar LLC |
255 MW | In study |
| Clairemont Solar 1 Solar · Clairemont Solar LLC |
252 MW | Agreement signed |
| Velociraptor Solar II Solar + storage · Greyhound Solar 3 LLC |
252 MW | In study |
| Paint Brush PV2 Solar · Renew Development HoldCo LLC |
252 MW | In study |
| Paint Brush PV3 Solar · Renew Development HoldCo LLC |
252 MW | In study |
| Cowboy Power Gas Plant Gas · Vaquero Power, LLC |
252 MW | In study |
| Paint Brush PV4 Solar · Renew Development HoldCo LLC |
252 MW | In study |
| Paint Brush PV1 Solar · Renew Development HoldCo LLC |
252 MW | In study |
| Althea Storage Battery storage · Sugaree Solar LLC |
251 MW | Agreement signed |
| Oak Valley Solar Solar · Oak Valley Solar LLC |
251 MW | In study |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
- MISO (Midcontinent)390 · 120.8 GW
- ERCOT (Texas)361 · 104.0 GW
- West (non-ISO utilities)325 · 84.1 GW
- SPP (Southwest Power Pool)268 · 71.3 GW
- Southeast (non-ISO utilities)264 · 42.0 GW
- PJM (Mid-Atlantic, Midwest)228 · 29.8 GW
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines · Planned power plants (EIA)