United States โบ Grid โบ Interconnection queues
OCTARY USA ยท INTERCONNECTION QUEUESWithdrawn queue requests in the USA (2024 requests) โ page 26
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| EE Lost Nation Group DG Study Solar |
10.0 MW | Withdrawn / abandoned |
| Solar Solar |
10.0 MW | Withdrawn / abandoned |
| Geothermal project Company QZ, Nye County Geothermal |
10.0 MW | Withdrawn / abandoned |
| RMLD DER Group Study Battery storage |
10.0 MW | Withdrawn / abandoned |
| Solar project 958048, Spartanburg County Solar |
10.0 MW | Withdrawn / abandoned |
| Jourdanton BESS Battery storage ยท Jourdanton BESS LLC |
9.8 MW | Withdrawn / abandoned |
| Solar project CS24-09, Adams County Solar |
9.5 MW | Withdrawn / abandoned |
| Onshore wind project J3598, Mclean County Onshore wind |
9.0 MW | Withdrawn / abandoned |
| Solar project 958350, Richmond County Solar |
8.2 MW | Withdrawn / abandoned |
| Solar Solar |
8.1 MW | Withdrawn / abandoned |
| Hydro project C4-094, Bighorn County Hydro |
8.0 MW | Withdrawn / abandoned |
| Other project J3765, St. James Parish County Other |
8.0 MW | Withdrawn / abandoned |
| E Babe Smith Solar Solar ยท Hwy 183 Solar LLC |
7.6 MW | Withdrawn / abandoned |
| Solar project 952090, Spartanburg County Solar |
6.6 MW | Withdrawn / abandoned |
| Solar project 957241, Chester County Solar |
6.0 MW | Withdrawn / abandoned |
| EE CT DER Group Study Battery storage |
5.0 MW | Withdrawn / abandoned |
| Solar project 958038, Spartanburg County Solar |
5.0 MW | Withdrawn / abandoned |
| EE 2024 SEMA/Cape ASO Group Study Solar + storage |
5.0 MW | Withdrawn / abandoned |
| EE 2024 SEMA/Cape ASO Group Study Solar + storage |
5.0 MW | Withdrawn / abandoned |
| EE CT DER Group Study Battery storage |
5.0 MW | Withdrawn / abandoned |
| Walpole 146 110A - 2023 EE GB ASO Solar + storage |
5.0 MW | Withdrawn / abandoned |
| RMLD DER Group Study Battery storage |
5.0 MW | Withdrawn / abandoned |
| EE 2024 SEMA/Cape ASO Group Study Battery storage |
5.0 MW | Withdrawn / abandoned |
| EE CT DG Group Study Solar |
5.0 MW | Withdrawn / abandoned |
| EE 2024 SEMA/Cape ASO Group Study Solar + storage |
5.0 MW | Withdrawn / abandoned |
| EE 2024 SEMA/Cape ASO Group Study Solar + storage |
5.0 MW | Withdrawn / abandoned |
| EE 2024 SEMA/Cape ASO Group Study Battery storage |
5.0 MW | Withdrawn / abandoned |
| EE 2024 SEMA/Cape ASO Group Study Solar + storage |
5.0 MW | Withdrawn / abandoned |
| Canton 470 110A - 2023 EE GB ASO Battery storage |
5.0 MW | Withdrawn / abandoned |
| Medway 65 110A - 2023 EE GB ASO Battery storage |
4.9 MW | Withdrawn / abandoned |
| HGE Group Study Battery storage |
4.9 MW | Withdrawn / abandoned |
| Woonsocket Substation โรรฌ Tifft ST BESS Battery storage |
4.5 MW | Withdrawn / abandoned |
| HGE Group Study Gas |
4.0 MW | Withdrawn / abandoned |
| Medway 65 110B - 2023 EE GB ASO Solar + storage |
3.9 MW | Withdrawn / abandoned |
| EE CT DER Group Study Solar |
3.7 MW | Withdrawn / abandoned |
| Geothermal project C4-001, Beaver County Geothermal |
3.6 MW | Withdrawn / abandoned |
| Tower Hill Substation - Western RI DER Study #3 Solar |
3.1 MW | Withdrawn / abandoned |
| Paxton BESS Battery storage |
3.0 MW | Withdrawn / abandoned |
| Solar project C4-119, Jackson County Solar |
3.0 MW | Withdrawn / abandoned |
| Point St Substation โรรฌ Aldrich St BESS Battery storage |
3.0 MW | Withdrawn / abandoned |
| Sheld BESS Battery storage |
3.0 MW | Withdrawn / abandoned |
| Battery Storage Battery storage |
3.0 MW | Withdrawn / abandoned |
| Solar project C4-121, Jefferson County Solar |
3.0 MW | Withdrawn / abandoned |
| Solar project C4-120, Jefferson County Solar |
3.0 MW | Withdrawn / abandoned |
| Solar project C4-122, Umatilla County Solar |
3.0 MW | Withdrawn / abandoned |
| Solar project C4-118, Linn County Solar |
3.0 MW | Withdrawn / abandoned |
| Solar project 957452, Johnston County Solar |
3.0 MW | Withdrawn / abandoned |
| TMLP Landfill Solar Solar |
3.0 MW | Withdrawn / abandoned |
| EE 2024 SEMA/Cape ASO Group Study Solar + storage |
2.8 MW | Withdrawn / abandoned |
| EE 2024 SEMA/Cape ASO Group Study Solar + storage |
2.5 MW | Withdrawn / abandoned |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
- MISO (Midcontinent)411 ยท 78.5 GW
- NYISO (New York)294 ยท 63.3 GW
- West (non-ISO utilities)237 ยท 46.1 GW
- Southeast (non-ISO utilities)195 ยท 32.8 GW
- ISO-NE (New England)97 ยท 13.2 GW
- ERCOT (Texas)50 ยท 10.0 GW
- SPP (Southwest Power Pool)29 ยท 7,503 MW
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines ยท Planned power plants (EIA)