United States βΊ Grid βΊ Interconnection queues βΊ South Carolina
SOLAR Β· SOUTHEASTSolar project 958048, Spartanburg County
Solar project 958048, Spartanburg County is a 10.0 MW solar request withdrawn in the Southeast interconnection queue, in Spartanburg County, South Carolina, connecting to Duke Energy Carolinas.
Queue statusWithdrawn / abandoned
- PlanningQueued Jun 2024 (completed)
- Withdrawn / abandoned (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 958048
- Grid region
- Southeast (non-ISO utilities)
- Utility / transmission owner
- Duke Energy Carolinas
- Connection point (POI)
- BMW MFG Corp 100 kV
- Location
- Spartanburg County, South Carolina
- Technology
- Solar: 10.0 MW
- Total requested
- 10.0 MW
- Service type
- Other
- Study phase
- Withdrawn
- Queue status
- Withdrawn
- Entered queue
- 28 June 2024
Location
Marker shows the centre of Spartanburg County; the queue data does not give exact sites.
Power plants in South Carolina Β· Transmission lines in South Carolina
Other requests in Spartanburg County
- Solar project 569804, Spartanburg CountySolar Β· 54.0 MW Β· agreement signed
- Battery storage project 977308, Spartanburg CountyBattery storage Β· 99.0 MW Β· in study
- Solar project 966893, Spartanburg CountySolar Β· 2.5 MW Β· in study
- Gas project 977574, Spartanburg CountyGas Β· 710 MW Β· withdrawn
- Battery storage project 900491, Spartanburg CountyBattery storage Β· 100 MW Β· withdrawn
- Gas project 974794, Spartanburg CountyGas Β· 48.0 MW Β· withdrawn
- Solar project 126048, Spartanburg CountySolar Β· 25.0 MW Β· withdrawn
- Solar project 952090, Spartanburg CountySolar Β· 6.6 MW Β· withdrawn
- Solar project 958038, Spartanburg CountySolar Β· 5.0 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem