United States › Grid › Interconnection queues › South Carolina
SOLAR · SOUTHEASTSolar project 569804, Spartanburg County
Solar project 569804, Spartanburg County is a 54.0 MW solar request with a signed interconnection agreement in the Southeast interconnection queue, in Spartanburg County, South Carolina, connecting to Duke Energy Carolinas.
Queue statusConsented
- PlanningQueued Jun 2022 (completed)
- Consented (current stage)
- Construction (not yet reached)
- OperatingTarget Mar 2028 (not yet reached)
- Closed (not yet reached)
Request details
- Queue ID
- 569804
- Grid region
- Southeast (non-ISO utilities)
- Utility / transmission owner
- Duke Energy Carolinas
- Connection point (POI)
- Avon WH 100 kV
- Location
- Spartanburg County, South Carolina
- Technology
- Solar: 54.0 MW
- Total requested
- 54.0 MW
- Service type
- Other
- Study phase
- Engineering Design - In Progress
- Queue status
- Active
- Entered queue
- 29 June 2022
- Proposed online date
- March 2028
Location
Marker shows the centre of Spartanburg County; the queue data does not give exact sites.
Power plants in South Carolina · Transmission lines in South Carolina
Other requests in Spartanburg County
- Battery storage project 977308, Spartanburg CountyBattery storage · 99.0 MW · in study
- Solar project 966893, Spartanburg CountySolar · 2.5 MW · in study
- Gas project 977574, Spartanburg CountyGas · 710 MW · withdrawn
- Battery storage project 900491, Spartanburg CountyBattery storage · 100 MW · withdrawn
- Gas project 974794, Spartanburg CountyGas · 48.0 MW · withdrawn
- Solar project 126048, Spartanburg CountySolar · 25.0 MW · withdrawn
- Solar project 958048, Spartanburg CountySolar · 10.0 MW · withdrawn
- Solar project 952090, Spartanburg CountySolar · 6.6 MW · withdrawn
- Solar project 958038, Spartanburg CountySolar · 5.0 MW · withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem