Requests shown1,272255.2 GW
Active in queue299.4 GW1,514 requests
Agreement signed43.0 GW228 requests
Withdrawn1,886378.9 GW never built

Map

Loading requestsโ€ฆ
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

1,272 requests ยท page 22 of 26
ProjectCapacityStatusLocationRegionQueuedOnline
Hydro project 437, Cascade County
Hydro
70.0 MWIn study Cascade, MTWest Dec 2022
Battery storage project AH2-107, City Of Suffolk County
Battery storage
69.0 MWIn study City Of Suffolk, VAPJM Feb 2022target 2024
Gas project AH2-106, Columbiana County
Gas
69.0 MWIn study Columbiana, OHPJM Feb 2022target 2022
Solar + storage project AI1-211, Preston County
Solar + storage
68.0 MWIn study Preston, WVPJM Sep 2022target 2024
Solar project 522, Choctaw County
Solar
67.0 MWIn study Choctaw, MSSoutheast Sep 2022target 2026
Lamar Unit 1 Repower
Gas ยท La Frontera Holdings, LLC
66.0 MWIn study Lamar, TXERCOT Jun 2022target 2027
Solar + storage project 433, Stillwater County
Solar + storage
65.0 MWIn study Stillwater, MTWest Sep 2022target 2025
Solar + storage project GI-2022-157, Imperial County
Solar + storage
65.0 MWIn study Imperial, CAWest Sep 2022target 2024
Solar + storage project 434, Stillwater County
Solar + storage
65.0 MWIn study Stillwater, MTWest Sep 2022target 2025
Smith Lake Storage DC
Solar + storage ยท Smith Lake Solar
65.0 MWIn study Grimes, TXERCOT Mar 2022target 2028
Solar project AH2-195, Indiana County
Solar
65.0 MWIn study Indiana, PAPJM Mar 2022target 2027
Demeter Storage
Solar + storage ยท Demeter Solar, LLC
65.0 MWIn study Caldwell, TXERCOT Aug 2022target 2029
Solar + storage project AI1-079, Adair County
Solar + storage
64.8 MWIn study Adair, KYPJM Jul 2022target 2026
Solar project AI1-147, Dekalb County
Solar
64.0 MWIn study Dekalb, ILPJM Sep 2022target 2026
Battery storage project AH2-072, Washington County
Battery storage
62.1 MWIn study Washington, VAPJM Jan 2022target 2025
Nymphaea Storage
Solar + storage ยท Nymphaea Solar, LLC
61.0 MWIn study Wichita, TXERCOT Sep 2022target 2028
Battery storage project J2376, Shelby County
Battery storage
60.0 MWIn study Shelby, ILMISO Sep 2022target 2024
Solar project AI1-105, Luzerne County
Solar
60.0 MWIn study Luzerne, PAPJM Aug 2022target 2026
Surplus; J1067
Other
60.0 MWIn study White, INMISO May 20222024
Indigo Storage
Solar + storage ยท Innovative Solar 245, LLC
60.0 MWIn study Fisher, TXERCOT Dec 2022target 2026
Solar + storage project Q444, Navajo County
Solar + storage
60.0 MWIn study Navajo, AZWest Mar 2022target 2024
Battery storage project GI-2022-161, Imperial County
Battery storage
60.0 MWIn study Imperial, CAWest Sep 2022target 2024
Gas project AI2-022, Bradford County
Gas
60.0 MWIn study Bradford, PAPJM Dec 2022target 2025
Solar project AI2-024, Meigs County
Solar
60.0 MWIn study Meigs, OHPJM Dec 2022target 2028
Solar project AI1-123, Lunenburg County
Solar
59.0 MWIn study Lunenburg, VAPJM Sep 2022target 2026
Battery storage project S0014, Washington County
Battery storage
58.0 MWIn study Washington, UTWest Nov 2022target 2026
Surplus; J928
Other
55.0 MWIn study Delta, MIMISO Apr 2022target 2025
Solar project AI1-151, Adams County
Solar
53.2 MWIn study Adams, OHPJM Sep 2022target 2027
Solar + storage project 630, Elko County
Solar + storage ยท Elko County Solar 1, LLC
53.0 MWPaused / redesign Elko, NVWest Jan 2022target 2025
Solar project AH2-080, Brunswick County
Solar
52.7 MWIn study Brunswick, VAPJM Jan 2022target 2025
Solar + storage project AH2-076, Perry County
Solar + storage
52.5 MWIn study Perry, KYPJM Jan 2022target 2023
Battery storage project AH2-145, King George County
Battery storage
52.3 MWIn study King George, VAPJM Feb 2022target 2027
Battery storage project AH2-372, Stephenson County
Battery storage
52.0 MWIn study Stephenson, ILPJM Mar 2022target 2028
Solar + storage project AH2-199, Will County
Solar + storage
51.7 MWIn study Will, ILPJM Mar 2022target 2026
Solar project AI1-120, Warren County
Solar
51.6 MWIn study Warren, NJPJM Sep 2022target 2025
Gas project J3213, Hennepin County
Gas
51.0 MWIn study Hennepin, MNMISO Sep 2022target 2026
Blanket Ranch North Storage
Solar + storage ยท Blanket Ranch North Solar, LLC
50.9 MWIn study Brown, TXERCOT Jun 2022target 2028
Hooper Solar
Solar + storage ยท BT Brown Solar, LLC
50.5 MWIn study Lee, TXERCOT Dec 2022target 2027
Albatross BESS
Battery storage ยท Albatross Solar, LLC
50.4 MWIn study Mclennan, TXERCOT May 2022target 2028
Battery storage project 22-07253, Weld County
Battery storage
50.0 MWIn study Weld, COWest Jul 2022target 2026
Solar + storage project GI-2022-160, Imperial County
Solar + storage
50.0 MWIn study Imperial, CAWest Sep 2022target 2024
Surplus; J1002
Other
50.0 MWIn study Waushara, WIMISO May 2022target 2023
Battery storage project IA-PNM 2022-10, Sandoval County
Battery storage
50.0 MWIn study Sandoval, NMWest Apr 2022target 2024
Solar + storage project 432, Wheatland County
Solar + storage
50.0 MWIn study Wheatland, MTWest Sep 2022target 2025
Battery storage project AH2-420, Crawford County
Battery storage
50.0 MWIn study Crawford, PAPJM Mar 2022target 2025
Solar + storage project 431, Wheatland County
Solar + storage
50.0 MWIn study Wheatland, MTWest Sep 2022target 2024
Solar + storage project AI1-019
Solar + storage
50.0 MWIn study KYPJM Apr 2022target 2026
Solar project AH2-135, Luzerne County
Solar
50.0 MWIn study Luzerne, PAPJM Feb 2022target 2025
Solar project J2429, Dane County
Solar
50.0 MWIn study Dane, WIMISO Sep 2022target 2027
Solar project AH2-223, Jay County
Solar
50.0 MWIn study Jay, INPJM Mar 2022target 2025

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines ยท Planned power plants (EIA)