United States › Grid › Interconnection queues › Ohio
SOLAR · PJMSolar project AI2-024, Meigs County
Solar project AI2-024, Meigs County is a 60.0 MW solar request in interconnection study in the PJM interconnection queue, in Meigs County, Ohio, connecting to AEP.
Queue statusIn planning
- PlanningQueued Dec 2022 (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- OperatingTarget Dec 2028 (not yet reached)
- Closed (not yet reached)
Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.
Request details
- Queue ID
- AI2-024
- Grid region
- PJM (Mid-Atlantic, Midwest)
- Utility / transmission owner
- AEP
- Connection point (POI)
- Racine - Ravenswood 69kV
- Location
- Meigs County, Ohio
- Technology
- Solar: 60.0 MW
- Total requested
- 60.0 MW
- Service type
- Network resource (NRIS)
- Study phase
- Feasibility Study
- Queue status
- Active
- Entered queue
- 22 December 2022
- Proposed online date
- December 2028
Location
Marker shows the centre of Meigs County; the queue data does not give exact sites.
Other requests in Meigs County
- Great BendSolar · 48.0 MW · agreement signed
- Coal project N42, Meigs CountyCoal · 1,200 MW · withdrawn
- RacineCoal · 1,035 MW · withdrawn
- Gas project W3-128, Meigs CountyGas · 652 MW · withdrawn
- Solar project AC2-048, Meigs CountySolar · 60.0 MW · withdrawn
- Solar project AC2-036, Meigs CountySolar · 20.0 MW · withdrawn
- Solar project AG2-589, Meigs CountySolar · 20.0 MW · withdrawn
- Solar project V4-055, Meigs CountySolar · 11.0 MW · withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem