United States βΊ Grid βΊ Interconnection queues βΊ Ohio
COAL Β· PJMRacine
Racine is a 1,035 MW coal request withdrawn in the PJM interconnection queue, in Meigs County, Ohio, connecting to AEP.
Queue statusWithdrawn / abandoned
- PlanningQueued Jan 2006 (completed)
- Withdrawn / abandonedJan 2010 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- P54
- Grid region
- PJM (Mid-Atlantic, Midwest)
- Utility / transmission owner
- AEP
- Connection point (POI)
- Sporn - Waterford 345kV
- Location
- Meigs County, Ohio
- Technology
- Coal: 1,035 MW
- Total requested
- 1,035 MW
- Service type
- Network resource (NRIS)
- Study phase
- Available studies: Feasibility Study, System Impact Study, Facilities Study; Interim/Interconnection Service Agreement:
- Queue status
- Withdrawn
- Entered queue
- 30 January 2006
- Proposed online date
- August 2014
- Withdrawn
- January 2010
Location
Marker shows the centre of Meigs County; the queue data does not give exact sites.
Other requests in Meigs County
- Great BendSolar Β· 48.0 MW Β· agreement signed
- Solar project AI2-024, Meigs CountySolar Β· 60.0 MW Β· in study
- Coal project N42, Meigs CountyCoal Β· 1,200 MW Β· withdrawn
- Gas project W3-128, Meigs CountyGas Β· 652 MW Β· withdrawn
- Solar project AC2-048, Meigs CountySolar Β· 60.0 MW Β· withdrawn
- Solar project AC2-036, Meigs CountySolar Β· 20.0 MW Β· withdrawn
- Solar project AG2-589, Meigs CountySolar Β· 20.0 MW Β· withdrawn
- Solar project V4-055, Meigs CountySolar Β· 11.0 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem