πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content

United States β€Ί Grid β€Ί Interconnection queues β€Ί Ohio

COAL Β· PJM

Coal project N42, Meigs County

Coal project N42, Meigs County is a 1,200 MW coal request withdrawn in the PJM interconnection queue, in Meigs County, Ohio, connecting to AEP.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Jan 2005 (completed)
  2. Withdrawn / abandonedDec 2011 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
N42
Grid region
PJM (Mid-Atlantic, Midwest)
Utility / transmission owner
AEP
Connection point (POI)
Mountaineer-Belmont 765kV
Location
Meigs County, Ohio
Technology
Coal: 1,200 MW
Total requested
1,200 MW
Service type
Network resource (NRIS)
Study phase
Available studies: Feasibility Study, System Impact Study
Queue status
Withdrawn
Entered queue
31 January 2005
Proposed online date
May 2010
Withdrawn
December 2011

Location

Marker shows the centre of Meigs County; the queue data does not give exact sites.

Power plants in Ohio Β· Transmission lines in Ohio

Other requests in Meigs County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem