Great Bend is a 48.0 MW solar request with a signed interconnection agreement in the PJM interconnection queue, in Meigs County, Ohio, connecting to AEP.
Queue statusConsented
- PlanningQueued Oct 2016 (completed)
- ConsentedDec 2021 (current stage)
- Construction (not yet reached)
- OperatingTarget Oct 2025 (not yet reached)
- Closed (not yet reached)
Request details
- Queue ID
- AC1-082
- Grid region
- PJM (Mid-Atlantic, Midwest)
- Utility / transmission owner
- AEP
- Connection point (POI)
- Ravenswood-Hemlock 69kV
- Location
- Meigs County, Ohio
- Technology
- Solar: 48.0 MW
- Total requested
- 48.0 MW
- Service type
- Network resource (NRIS)
- Study phase
- Available studies: Feasibility Study, System Impact Study, Facilities Study; Interim/Interconnection Service Agreement:
- Queue status
- Active
- Entered queue
- 1 October 2016
- Agreement signed
- 1 December 2021
- Proposed online date
- October 2025
Location
Marker shows the centre of Meigs County; the queue data does not give exact sites.
Other requests in Meigs County
- Solar project AI2-024, Meigs CountySolar · 60.0 MW · in study
- Coal project N42, Meigs CountyCoal · 1,200 MW · withdrawn
- RacineCoal · 1,035 MW · withdrawn
- Gas project W3-128, Meigs CountyGas · 652 MW · withdrawn
- Solar project AC2-048, Meigs CountySolar · 60.0 MW · withdrawn
- Solar project AC2-036, Meigs CountySolar · 20.0 MW · withdrawn
- Solar project AG2-589, Meigs CountySolar · 20.0 MW · withdrawn
- Solar project V4-055, Meigs CountySolar · 11.0 MW · withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem