United States › Grid › Interconnection queues › Montana

SOLAR + STORAGE · WEST

Solar + storage project 433, Stillwater County

Solar + storage project 433, Stillwater County is a 65.0 MW solar + storage request in interconnection study in the West interconnection queue, in Stillwater County, Montana, connecting to NorthWestern Energy.

Queue statusIn planning
  1. PlanningQueued Sep 2022 (current stage)
  2. Consented (not yet reached)
  3. Construction (not yet reached)
  4. OperatingTarget Oct 2025 (not yet reached)
  5. Closed (not yet reached)

Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.

Request details

Queue ID
433
Grid region
West (non-ISO utilities)
Utility / transmission owner
NorthWestern Energy
Connection point (POI)
Columbus Rapelje Substation
Location
Stillwater County, Montana
Technology
Solar: 65.0 MW · Battery
Total requested
65.0 MW
Service type
Energy only (ERIS)
Study phase
System Impact 2/7/2023 System Impact Re-Study 6/2/2023 Facilities Study 9/20/2023
Queue status
Active
Entered queue
6 September 2022
Proposed online date
October 2025

Location

Marker shows the centre of Stillwater County; the queue data does not give exact sites.

Power plants in Montana · Transmission lines in Montana

Other requests in Stillwater County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem