Solar project 203, Stillwater County

Solar project 203, Stillwater County is a 2.0 MW solar request built and operating in the West interconnection queue, in Stillwater County, Montana, connecting to NorthWestern Energy.

Queue statusOperating
  1. PlanningQueued Apr 2015 (completed)
  2. Consented (completed)
  3. Construction (completed)
  4. OperatingApr 2016 (current stage)
  5. Closed (not yet reached)

Request details

Queue ID
203
Grid region
West (non-ISO utilities)
Utility / transmission owner
NorthWestern Energy
Connection point (POI)
Reed Point Substation, Reed Point
Location
Stillwater County, Montana
Technology
Solar: 2.0 MW
Total requested
2.0 MW
Service type
Energy only (ERIS)
Study phase
System Impact Study Facilities Study
Queue status
Operational
Entered queue
24 April 2015
Proposed online date
April 2016
Came online
April 2016

Location

Marker shows the centre of Stillwater County; the queue data does not give exact sites.

Power plants in Montana · Transmission lines in Montana

Other requests in Stillwater County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem