United States β€Ί Grid β€Ί Interconnection queues β€Ί Montana

ONSHORE WIND Β· WEST

Onshore wind project 145, Stillwater County

Onshore wind project 145, Stillwater County is a 200 MW onshore wind request withdrawn in the West interconnection queue, in Stillwater County, Montana, connecting to NorthWestern Energy.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Jul 2011 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
145
Grid region
West (non-ISO utilities)
Utility / transmission owner
NorthWestern Energy
Connection point (POI)
10 miles north of Columbus, MT
Location
Stillwater County, Montana
Technology
Wind: 200 MW
Total requested
200 MW
Service type
NRIS and ERIS
Queue status
Withdrawn
Entered queue
18 July 2011
Proposed online date
December 2013

Location

Marker shows the centre of Stillwater County; the queue data does not give exact sites.

Power plants in Montana Β· Transmission lines in Montana

Other requests in Stillwater County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem