United States βΊ Grid βΊ Interconnection queues βΊ Montana
ONSHORE WIND Β· WESTOnshore wind project 451, Stillwater County
Onshore wind project 451, Stillwater County is a 100 MW onshore wind request withdrawn in the West interconnection queue, in Stillwater County, Montana, connecting to NorthWestern Energy.
Queue statusWithdrawn / abandoned
- PlanningQueued Oct 2023 (completed)
- Withdrawn / abandoned (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 451
- Grid region
- West (non-ISO utilities)
- Utility / transmission owner
- NorthWestern Energy
- Connection point (POI)
- 230 kV line between Columbus-Rapelje and Stillwater Wind
- Location
- Stillwater County, Montana
- Technology
- Wind: 100 MW
- Total requested
- 100 MW
- Service type
- NRIS and ERIS
- Study phase
- Feasibility Study 1/25/2024
- Queue status
- Withdrawn
- Entered queue
- 24 October 2023
- Proposed online date
- December 2028
Location
Marker shows the centre of Stillwater County; the queue data does not give exact sites.
Other requests in Stillwater County
- Wind + storage project 300, Stillwater CountyWind + storage Β· 315 MW Β· in study
- Gas project 465, Stillwater CountyGas Β· 150 MW Β· in study
- Solar + storage project 433, Stillwater CountySolar + storage Β· 65.0 MW Β· in study
- Solar + storage project 434, Stillwater CountySolar + storage Β· 65.0 MW Β· in study
- Onshore wind project 438, Stillwater CountyOnshore wind Β· 250 MW Β· suspended
- Solar + storage project 421, Stillwater CountySolar + storage Β· 200 MW Β· suspended
- Onshore wind project 244, Stillwater CountyOnshore wind Β· 80.0 MW Β· built
- Solar project 203, Stillwater CountySolar Β· 2.0 MW Β· built
- Onshore wind project 31, Stillwater CountyOnshore wind Β· 396 MW Β· withdrawn
- Onshore wind project 302, Stillwater CountyOnshore wind Β· 302 MW Β· withdrawn
- Onshore wind project 145, Stillwater CountyOnshore wind Β· 200 MW Β· withdrawn
- Onshore wind project 147, Stillwater CountyOnshore wind Β· 200 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem