Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| Solar project J1836, Callaway County Solar |
300 MW | In study |
| Dawson Solar Solar · Deriva Energy Solar, LLC |
300 MW | In study |
| Atrisco Solar II Solar + storage |
300 MW | Paused / redesign |
| Solar + storage project G0639, Douglas County Solar + storage |
300 MW | In study |
| Burr Oak Solar Solar · Leeward Renewable Energy Development, LLC |
300 MW | In study |
| South Dixon Solar Solar · Deriva Energy Solar, LLC |
300 MW | In study |
| Solar + storage project G0660, Grant County Solar + storage |
300 MW | In study |
| Sandow Solar Solar · Sandow Lakes Ranch Solar I, LLC |
287 MW | In study |
| Solar + storage project Q362, Pinal County Solar + storage |
275 MW | In study |
| Beacon Solar Solar · Beacon Solar, LLC |
260 MW | In study |
| Sierra Madre Solar Solar · Sierra Madre Solar LLC |
255 MW | In study |
| Gipper Solar Farm Solar · Gipper Solar Farm, LLC |
255 MW | In study |
| Pandora Solar Solar |
252 MW | Paused / redesign |
| Cantaloupe Storage Battery storage |
251 MW | Paused / redesign |
| Other project Company KW, White Pine County Other |
250 MW | Paused / redesign |
| Commerce Energy Storage 2 Battery storage |
250 MW | In study |
| Solar + storage project IC-932, Glynn County Solar + storage |
250 MW | Paused / redesign |
| Battery storage project Q79, Kern County Battery storage |
250 MW | In study |
| Mill Point Solar Solar + storage · ConnectGen Montgomery County LLC |
250 MW | In study |
| Solar + storage project IC-933, Glynn County Solar + storage |
250 MW | Paused / redesign |
| Other project 87, Apache County Other |
250 MW | In study |
| Solar + storage project 3, Sacramento County Solar + storage |
250 MW | In study |
| Solar + storage project Q354, Maricopa County Solar + storage |
250 MW | In study |
| Solar project J1840, Dewitt County Solar |
250 MW | In study |
| Iguala Solar Solar |
250 MW | Paused / redesign |
| Other project 86, Apache County Other |
250 MW | In study |
| Razorbill Solar Solar + storage · RWE Solar Development, LLC |
240 MW | In study |
| Onshore wind project G0640, Klamath County Onshore wind |
239 MW | In study |
| Solar + storage project GI-2020-10, Pueblo County Solar + storage |
230 MW | Paused / redesign |
| Pluto Solar Solar |
228 MW | Paused / redesign |
| Solar + storage project Q75, Kern County Solar + storage |
225 MW | In study |
| NYC Energy LLC - Phase 2 Battery storage · NYC Energy |
220 MW | In study |
| Solar project IC-908, Turner County Solar |
220 MW | Paused / redesign |
| Maratua Solar Solar · BDPU Solar Maratua, LLC |
217 MW | Paused / redesign |
| Solar + storage project GEN-2020-013, Harlan County Solar + storage |
215 MW | In study |
| Alamosa Solar Solar |
210 MW | Paused / redesign |
| Val Vista Grid BESS 1 Battery storage · Val Vista Grid, LLC |
209 MW | In study |
| BRP Rhine BESS Battery storage · BRP Rhine BESS LLC |
207 MW | In study |
| BRP Volans BESS Battery storage · BRP Volans BESS LLC |
207 MW | In study |
| BRP Pyxis BESS Battery storage · BRP Pyxis BESS LLC |
207 MW | In study |
| Sepik BESS Battery storage · BRP Sepik BESS LLC |
205 MW | In study |
| East Fishkill Battery storage · East Fishkill Storage 1, LLC |
205 MW | In study |
| Battery storage project GEN-2020-090, Bourbon County Battery storage |
204 MW | In study |
| Puff Hybrid Solar Solar + storage |
204 MW | In study |
| Kinenos Solar Solar · Encino del Sol Energy, LLC |
203 MW | In study |
| Loma Pinta Solar Solar · Loma Pinta Wind Energy, LLC |
203 MW | In study |
| BRP Kabru BESS Battery storage · BRP Kabru BESS LLC |
203 MW | In study |
| BRP Kamet BESS Battery storage · BRP Kamet BESS LLC |
203 MW | In study |
| BRP Perseus BESS Battery storage · BRP Perseus BESS LLC |
203 MW | In study |
| Nockenut Springs Solar 3 Solar · Pecan Springs Energy, LLC |
201 MW | In study |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
- West (non-ISO utilities)67 · 19.0 GW
- ERCOT (Texas)57 · 12.2 GW
- MISO (Midcontinent)56 · 9,500 MW
- PJM (Mid-Atlantic, Midwest)50 · 5,495 MW
- CAISO (California)9 · 3,749 MW
- Southeast (non-ISO utilities)29 · 2,767 MW
- NYISO (New York)19 · 2,230 MW
- SPP (Southwest Power Pool)10 · 2,198 MW
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines · Planned power plants (EIA)