πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content

United States β€Ί Grid β€Ί Interconnection queues β€Ί Texas

OCTARY USA Β· INTERCONNECTION QUEUES

Interconnection queue in Texas (2019 requests) β€” page 2

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown7514.0 GW
Active in queue14.0 GW75 requests
Agreement signed7,717 MW35 requests
Withdrawn10519.0 GW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

75 requests Β· page 2 of 2
ProjectCapacityStatusLocationRegionQueuedOnline
Dove Run Solar
Solar Β· Dove Run Solar Project, LLC
121 MWAgreement signed Duval, TXERCOT May 2019target 2027
Trinidad ESS Addition
Battery storage
110 MWPaused / redesign Henderson, TXERCOT Dec 2019target 2026
Holstein 2 Energy Storage
Solar + storage Β· 229HD 8me LLC
102 MWIn study Nolan, TXERCOT Aug 2019target 2027
San Bernard Solar II
Solar Β· San Bernard Solar II, LLC
102 MWPaused / redesign Wharton, TXERCOT Mar 2019target 2022
Jayhawk Solar
Solar Β· Renewable Energy Ventures, LLC
102 MWIn study Mitchell, TXERCOT Aug 2019target 2025
Lamkin Solar
Solar Β· Commanche Solar, LLC
102 MWAgreement signed Comanche, TXERCOT Jun 2019target 2027
San Bernard Storage
Other Β· San Bernard Storage, LLC
101 MWPaused / redesign Wharton, TXERCOT Nov 2019target 2022
Long Point Storage
Solar + storage Β· Long Point Storage, LLC
101 MWAgreement signed Brazoria, TXERCOT Nov 2019target 2026
DAMAZO (Second Division) SOLAR
Solar Β· TX Gulf Solar 1 LLC
100 MWAgreement signed Brazoria, TXERCOT Mar 2019target 2025
Coleto Creek ESS Addition
Battery storage
100 MWPaused / redesign Goliad, TXERCOT Dec 2019
Independence Trail Storage
Battery storage Β· KCE TX 16, LLC
100 MWIn study Childress, TXERCOT Dec 2019target 2028
Mars Solar
Solar
52.8 MWPaused / redesign Childress, TXERCOT Feb 2019
Ryan Energy Storage
Battery storage Β· Ryan Storage LLC
51.6 MWAgreement signed Coryell, TXERCOT Jan 2019target 2026
Volunteer Storage
Battery storage Β· Blackjack Storage LLC
50.6 MWIn study Caldwell, TXERCOT Jan 2019target 2028
Pearl Crescent Storage
Solar + storage Β· RWE Solar Development, LLC
50.3 MWIn study Colorado, TXERCOT Dec 2019target 2026
Voyager Storage
Battery storage Β· EDF Renewables Development, Inc.
50.1 MWIn study Wharton, TXERCOT Jan 2019target 2028
Tokyo TxHSR TPSS EW-1
Other Β· Texas Central Rail Holdings, LLC
50.0 MWIn study Ellis, TXERCOT Jan 2019target 2028
Edgewater Storage
Battery storage Β· Edgewater Battery Storage LLC
50.0 MWIn study Ellis, TXERCOT Apr 2019target 2028
Atlanta TxHSR TPSS DS-1
Other Β· Texas Central Rail Holdings, LLC
50.0 MWIn study Dallas, TXERCOT Jan 2019target 2028
Barcelona TxHSR TPSS HN-4
Other Β· Texas Central Rail Holdings, LLC
50.0 MWIn study Harris, TXERCOT Jan 2019target 2028
Turin TxHSR TPSS HN-6
Other Β· Texas Central Rail Holdings, LLC
50.0 MWIn study Grimes, TXERCOT Sep 2019target 2028
Chariot Storage
Battery storage Β· Chariot Storage LLC
50.0 MWIn study Limestone, TXERCOT Mar 2019target 2028
Knickerbocker Storage
Other Β· Knickerbocker Solar LLC
25.0 MWPaused / redesign Tom Green, TXERCOT Dec 2019target 2028
Wise County Power Repower (CT1, CT2)
Gas Β· Wise County Power Company LLC
21.0 MWAgreement signed Wise, TXERCOT Jul 2019target 2026
Sparkl BESS
Battery storage
20.0 MWPaused / redesign Guadalupe, TXERCOT Dec 2019
Page 2 of 2

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)