United States › Grid › Interconnection queues
OCTARY USA · INTERCONNECTION QUEUESInterconnection queue in ISO-NE (New England) — page 2
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| Nutes Solar Solar |
20.0 MW | Agreement signed |
| Fair Haven Solar Solar |
20.0 MW | Agreement signed |
| Solar Solar |
20.0 MW | In study |
| Shaftsbury Solar Solar |
20.0 MW | Agreement signed |
| BD Solar Church Hill Solar |
20.0 MW | Agreement signed |
| GDC Saco Solar Solar |
20.0 MW | Agreement signed |
| Turner Meadow Solar Solar |
19.8 MW | Agreement signed |
| Battery Storage Battery storage |
19.3 MW | In study |
| Battery Storage Battery storage |
19.3 MW | In study |
| Twin Energy Wind Onshore wind |
18.3 MW | Agreement signed |
| SolarFairfield Solar |
18.1 MW | Agreement signed |
| Offshore wind Inc (QP700) Offshore wind |
18.0 MW | In study |
| West Baldwin Solar Solar |
17.1 MW | Agreement signed |
| Emery Meadow Solar Solar |
16.4 MW | Agreement signed |
| Solar Solar |
7.0 MW | Agreement signed |
| Solar Solar |
6.8 MW | Agreement signed |
| Battery addition Other |
6.7 MW | Agreement signed |
| Solar Increase Solar |
5.0 MW | In study |
| Grissom Solar Solar |
5.0 MW | Agreement signed |
| Berkshire Wind Increase Onshore wind |
4.6 MW | Agreement signed |
| Roxbury Solar Solar |
2.0 MW | Agreement signed |
| NEA Bell. Uprate (Northeast Energy Associates, LP) Gas |
1.4 MW | Agreement signed |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
- West (non-ISO utilities)1,857 · 519.1 GW
- ERCOT (Texas)1,986 · 447.3 GW
- MISO (Midcontinent)1,646 · 350.1 GW
- CAISO (California)429 · 188.6 GW
- Southeast (non-ISO utilities)1,067 · 161.4 GW
- SPP (Southwest Power Pool)692 · 152.4 GW
- PJM (Mid-Atlantic, Midwest)1,248 · 140.4 GW
- NYISO (New York)190 · 27.1 GW
- ISO-NE (New England)72 · 14.6 GW
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines · Planned power plants (EIA)