United States βΊ Grid βΊ Interconnection queues
OCTARY USA Β· INTERCONNECTION QUEUESInterconnection queue in ERCOT (Texas) (2019 requests) β page 2
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| San Bernard Solar II Solar Β· San Bernard Solar II, LLC |
102 MW | Paused / redesign |
| Jayhawk Solar Solar Β· Renewable Energy Ventures, LLC |
102 MW | In study |
| Lamkin Solar Solar Β· Commanche Solar, LLC |
102 MW | Agreement signed |
| San Bernard Storage Other Β· San Bernard Storage, LLC |
101 MW | Paused / redesign |
| Long Point Storage Solar + storage Β· Long Point Storage, LLC |
101 MW | Agreement signed |
| DAMAZO (Second Division) SOLAR Solar Β· TX Gulf Solar 1 LLC |
100 MW | Agreement signed |
| Coleto Creek ESS Addition Battery storage |
100 MW | Paused / redesign |
| Independence Trail Storage Battery storage Β· KCE TX 16, LLC |
100 MW | In study |
| Mars Solar Solar |
52.8 MW | Paused / redesign |
| Ryan Energy Storage Battery storage Β· Ryan Storage LLC |
51.6 MW | Agreement signed |
| Volunteer Storage Battery storage Β· Blackjack Storage LLC |
50.6 MW | In study |
| Pearl Crescent Storage Solar + storage Β· RWE Solar Development, LLC |
50.3 MW | In study |
| Voyager Storage Battery storage Β· EDF Renewables Development, Inc. |
50.1 MW | In study |
| Tokyo TxHSR TPSS EW-1 Other Β· Texas Central Rail Holdings, LLC |
50.0 MW | In study |
| Edgewater Storage Battery storage Β· Edgewater Battery Storage LLC |
50.0 MW | In study |
| Atlanta TxHSR TPSS DS-1 Other Β· Texas Central Rail Holdings, LLC |
50.0 MW | In study |
| Barcelona TxHSR TPSS HN-4 Other Β· Texas Central Rail Holdings, LLC |
50.0 MW | In study |
| Turin TxHSR TPSS HN-6 Other Β· Texas Central Rail Holdings, LLC |
50.0 MW | In study |
| Chariot Storage Battery storage Β· Chariot Storage LLC |
50.0 MW | In study |
| Knickerbocker Storage Other Β· Knickerbocker Solar LLC |
25.0 MW | Paused / redesign |
| Wise County Power Repower (CT1, CT2) Gas Β· Wise County Power Company LLC |
21.0 MW | Agreement signed |
| Sparkl BESS Battery storage |
20.0 MW | Paused / redesign |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
- CAISO (California)36 Β· 21.8 GW
- West (non-ISO utilities)72 Β· 21.7 GW
- MISO (Midcontinent)130 Β· 20.0 GW
- PJM (Mid-Atlantic, Midwest)183 Β· 19.2 GW
- ERCOT (Texas)72 Β· 13.4 GW
- Southeast (non-ISO utilities)37 Β· 6,006 MW
- SPP (Southwest Power Pool)21 Β· 2,722 MW
- NYISO (New York)31 Β· 2,705 MW
- ISO-NE (New England)7 Β· 1,764 MW
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)