OCTARY USA · INTERCONNECTION QUEUES

Withdrawn queue requests in CAISO (California) — page 19

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown2,186619.9 GW
Active in queue188.6 GW429 requests
Agreement signed96.2 GW235 requests
Withdrawn2,186619.9 GW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

2,186 requests · page 19 of 44
ProjectCapacityStatusLocationRegionQueuedOnline
Blitz Energy Storage
Battery storage
214 MWWithdrawn / abandoned Sonoma, CACAISO Apr 2021target 2029
Stageline Energy Storage
Battery storage
214 MWWithdrawn / abandoned Butte, CACAISO Apr 2021target 2030
Flea Flicker Energy Storage
Battery storage
214 MWWithdrawn / abandoned Los Angeles, CACAISO Apr 2021target 2033
Brix Energy Storage
Battery storage
214 MWWithdrawn / abandoned Sonoma, CACAISO Apr 2021target 2027
Kratos BESS
Battery storage
214 MWWithdrawn / abandoned Kings, CACAISO Apr 2021target 2024
Toledo Storage
Battery storage
213 MWWithdrawn / abandoned Contra Costa, CACAISO Apr 2021target 2025
La Paloma Wind
Onshore wind
212 MWWithdrawn / abandoned CACAISO Apr 2023target 2030
Imperial Soleil
Solar
212 MWWithdrawn / abandoned Imperial, CACAISO Feb 2007target 2011
Northline
Solar + storage
212 MWWithdrawn / abandoned Merced, CACAISO Apr 2021target 2024
Barstow Solar 1
Solar
211 MWWithdrawn / abandoned San Bernardino, CACAISO May 2016target 2021
Stockton Peakers Project
Gas
211 MWWithdrawn / abandoned San Joaquin, CACAISO Mar 2007target 2009
Wildhorse
Onshore wind
210 MWWithdrawn / abandoned Monterey, CACAISO Apr 2006target 2008
Swiftstone
Solar + storage
210 MWWithdrawn / abandoned CACAISO Apr 2023target 2027
Madera Energy Center
Gas
210 MWWithdrawn / abandoned Madera, CACAISO Apr 2007target 2014
Pahrump Valley Solar (Fka Lathrop Wells 240MW)
Solar
210 MWWithdrawn / abandoned Nye, NVCAISO Apr 2012target 2019
Dasos 10
Solar
210 MWWithdrawn / abandoned Merced, CACAISO May 2017target 2020
Storing Energy Center
Battery storage
209 MWWithdrawn / abandoned CACAISO Apr 2023target 2027
Foothills (Formly Spring Bath Hybrid)
Solar + storage
209 MWWithdrawn / abandoned CACAISO Apr 2023target 2028
Lizard Spin Energy Center
Battery storage
209 MWWithdrawn / abandoned CACAISO Apr 2023target 2027
Re Prism
Solar
209 MWWithdrawn / abandoned Nye, NVCAISO May 2016target 2019
Perseus Solar
Solar
209 MWWithdrawn / abandoned Merced, CACAISO May 2017target 2021
Norma
Solar + storage
208 MWWithdrawn / abandoned CACAISO Apr 2023target 2026
Arcana Solar
Solar + storage
208 MWWithdrawn / abandoned CACAISO Apr 2023target 2029
Mount Laguna Wind
Onshore wind
208 MWWithdrawn / abandoned San Diego, CACAISO May 2016target 2023
Capp Energy Storage
Battery storage
207 MWWithdrawn / abandoned CACAISO Apr 2023target 2028
Urogallo Storage
Battery storage
207 MWWithdrawn / abandoned CACAISO Apr 2023target 2027
Paseo Energy Storage
Battery storage
207 MWWithdrawn / abandoned CACAISO Apr 2023target 2027
Menifee Power Bank Expansion
Battery storage
207 MWWithdrawn / abandoned CACAISO Apr 2023target 2030
Foothills
Solar + storage
207 MWWithdrawn / abandoned CACAISO Apr 2023target 2028
Lince Storage
Battery storage
207 MWWithdrawn / abandoned CACAISO Apr 2023target 2028
Coso Solar 2
Solar
207 MWWithdrawn / abandoned Inyo, CACAISO May 2016target 2019
Superba Hybrid
Solar + storage
207 MWWithdrawn / abandoned CACAISO Apr 2023target 2029
Richgrove
Battery storage
207 MWWithdrawn / abandoned CACAISO Apr 2023target 2028
Rolling Hills Solar
Solar
206 MWWithdrawn / abandoned Kern, CACAISO May 2016target 2020
Mandorla
Solar + storage
206 MWWithdrawn / abandoned Tehama, CACAISO Apr 2023target 2030
Romero Creek
Wind + storage
206 MWWithdrawn / abandoned Merced, CACAISO May 2016target 2023
Heartland 3
Solar + storage
206 MWWithdrawn / abandoned Fresno, CACAISO Apr 2018target 2022
Marley
Battery storage
206 MWWithdrawn / abandoned Riverside, CACAISO Apr 2021target 2032
Algoso Es
Battery storage
206 MWWithdrawn / abandoned Kern, CACAISO Apr 2015target 2021
Aqueduct Energy Storage 2
Battery storage
206 MWWithdrawn / abandoned CACAISO Apr 2023target 2028
Caelum
Battery storage
206 MWWithdrawn / abandoned CACAISO Apr 2023target 2026
Solstice
Other
206 MWWithdrawn / abandoned CACAISO Apr 2023target 2028
Kane
Battery storage
206 MWWithdrawn / abandoned CACAISO Apr 2023target 2026
Calico Peak Energy Storage Facility
Battery storage
206 MWWithdrawn / abandoned CACAISO Apr 2023target 2026
Eagleman
Battery storage
206 MWWithdrawn / abandoned CACAISO Apr 2023target 2028
Fortis 2
Battery storage
206 MWWithdrawn / abandoned CACAISO Apr 2023target 2028
Krahill
Battery storage
206 MWWithdrawn / abandoned CACAISO Apr 2023target 2026
Griffin
Battery storage
206 MWWithdrawn / abandoned CACAISO Apr 2023target 2028
Buckaroo Solar Storage
Solar + storage
206 MWWithdrawn / abandoned Kern, CACAISO Apr 2021target 2024
Mikado
Solar + storage
206 MWWithdrawn / abandoned Imperial, CACAISO Apr 2015target 2018
Page 19 of 44

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines · Planned power plants (EIA)