| Project | Capacity | Status |
|---|---|---|
| Blitz Energy Storage Battery storage |
214 MW | Withdrawn / abandoned |
| Stageline Energy Storage Battery storage |
214 MW | Withdrawn / abandoned |
| Flea Flicker Energy Storage Battery storage |
214 MW | Withdrawn / abandoned |
| Brix Energy Storage Battery storage |
214 MW | Withdrawn / abandoned |
| Kratos BESS Battery storage |
214 MW | Withdrawn / abandoned |
| Toledo Storage Battery storage |
213 MW | Withdrawn / abandoned |
| La Paloma Wind Onshore wind |
212 MW | Withdrawn / abandoned |
| Imperial Soleil Solar |
212 MW | Withdrawn / abandoned |
| Northline Solar + storage |
212 MW | Withdrawn / abandoned |
| Barstow Solar 1 Solar |
211 MW | Withdrawn / abandoned |
| Stockton Peakers Project Gas |
211 MW | Withdrawn / abandoned |
| Wildhorse Onshore wind |
210 MW | Withdrawn / abandoned |
| Swiftstone Solar + storage |
210 MW | Withdrawn / abandoned |
| Madera Energy Center Gas |
210 MW | Withdrawn / abandoned |
| Pahrump Valley Solar (Fka Lathrop Wells 240MW) Solar |
210 MW | Withdrawn / abandoned |
| Dasos 10 Solar |
210 MW | Withdrawn / abandoned |
| Storing Energy Center Battery storage |
209 MW | Withdrawn / abandoned |
| Foothills (Formly Spring Bath Hybrid) Solar + storage |
209 MW | Withdrawn / abandoned |
| Lizard Spin Energy Center Battery storage |
209 MW | Withdrawn / abandoned |
| Re Prism Solar |
209 MW | Withdrawn / abandoned |
| Perseus Solar Solar |
209 MW | Withdrawn / abandoned |
| Norma Solar + storage |
208 MW | Withdrawn / abandoned |
| Arcana Solar Solar + storage |
208 MW | Withdrawn / abandoned |
| Mount Laguna Wind Onshore wind |
208 MW | Withdrawn / abandoned |
| Capp Energy Storage Battery storage |
207 MW | Withdrawn / abandoned |
| Urogallo Storage Battery storage |
207 MW | Withdrawn / abandoned |
| Paseo Energy Storage Battery storage |
207 MW | Withdrawn / abandoned |
| Menifee Power Bank Expansion Battery storage |
207 MW | Withdrawn / abandoned |
| Foothills Solar + storage |
207 MW | Withdrawn / abandoned |
| Lince Storage Battery storage |
207 MW | Withdrawn / abandoned |
| Coso Solar 2 Solar |
207 MW | Withdrawn / abandoned |
| Superba Hybrid Solar + storage |
207 MW | Withdrawn / abandoned |
| Richgrove Battery storage |
207 MW | Withdrawn / abandoned |
| Rolling Hills Solar Solar |
206 MW | Withdrawn / abandoned |
| Mandorla Solar + storage |
206 MW | Withdrawn / abandoned |
| Romero Creek Wind + storage |
206 MW | Withdrawn / abandoned |
| Heartland 3 Solar + storage |
206 MW | Withdrawn / abandoned |
| Marley Battery storage |
206 MW | Withdrawn / abandoned |
| Algoso Es Battery storage |
206 MW | Withdrawn / abandoned |
| Aqueduct Energy Storage 2 Battery storage |
206 MW | Withdrawn / abandoned |
| Caelum Battery storage |
206 MW | Withdrawn / abandoned |
| Solstice Other |
206 MW | Withdrawn / abandoned |
| Kane Battery storage |
206 MW | Withdrawn / abandoned |
| Calico Peak Energy Storage Facility Battery storage |
206 MW | Withdrawn / abandoned |
| Eagleman Battery storage |
206 MW | Withdrawn / abandoned |
| Fortis 2 Battery storage |
206 MW | Withdrawn / abandoned |
| Krahill Battery storage |
206 MW | Withdrawn / abandoned |
| Griffin Battery storage |
206 MW | Withdrawn / abandoned |
| Buckaroo Solar Storage Solar + storage |
206 MW | Withdrawn / abandoned |
| Mikado Solar + storage |
206 MW | Withdrawn / abandoned |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
- West (non-ISO utilities)5,277 · 949.5 GW
- PJM (Mid-Atlantic, Midwest)5,226 · 638.1 GW
- MISO (Midcontinent)3,261 · 621.9 GW
- CAISO (California)2,186 · 619.9 GW
- Southeast (non-ISO utilities)2,738 · 603.3 GW
- SPP (Southwest Power Pool)1,846 · 382.9 GW
- NYISO (New York)1,531 · 324.1 GW
- ERCOT (Texas)1,158 · 262.0 GW
- ISO-NE (New England)982 · 118.1 GW
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines · Planned power plants (EIA)