🔌 EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more → Skip to main content

United States › Grid › Interconnection queues › California

GAS · CAISO

Stockton Peakers Project

Stockton Peakers Project is a 211 MW gas request withdrawn in the CAISO interconnection queue, in San Joaquin County, California, connecting to PGAE.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Mar 2007 (completed)
  2. Withdrawn / abandonedNov 2007 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
186
Grid region
CAISO (California)
Utility / transmission owner
PGAE
Connection point (POI)
Stockton¬øA¬ø-Lockeford-Bellota 115kV #1&#2 lines & Tesla-Tracy 115kV line
Location
San Joaquin County, California
Technology
Gas: 211 MW
Total requested
211 MW
Study phase
System Impact Study
Queue status
Withdrawn
Entered queue
7 March 2007
Proposed online date
December 2009
Withdrawn
November 2007

Location

Marker shows the centre of San Joaquin County; the queue data does not give exact sites.

Power plants in California · Transmission lines in California

Other requests in San Joaquin County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem