United States › Grid › Interconnection queues
OCTARY USA · INTERCONNECTION QUEUESWithdrawn queue requests in the USA (2021 requests) — page 18
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| Solar + storage project 612, Elmore County Solar + storage |
115 MW | Withdrawn / abandoned |
| OYA Fort Plain Solar Solar · OYA Solar CDG LLC |
115 MW | Withdrawn / abandoned |
| Solar project J1972, Des Moines County Solar |
115 MW | Withdrawn / abandoned |
| Meadow Ridge Solar And Battery Solar + storage |
114 MW | Withdrawn / abandoned |
| Gas project 153, Horry County Gas |
113 MW | Withdrawn / abandoned |
| Solar + Battery Storage Solar + storage |
113 MW | Withdrawn / abandoned |
| Sodis Storage Battery storage |
112 MW | Withdrawn / abandoned |
| Battery storage project AH1-477, Howard County Battery storage |
112 MW | Withdrawn / abandoned |
| Solar project AH1-014, Huntington County Solar |
112 MW | Withdrawn / abandoned |
| Pequin BESS Alt#1 Other · Pequin Energy Storage, LLC |
111 MW | Withdrawn / abandoned |
| Battery storage project J1992, Lonoke County Battery storage |
110 MW | Withdrawn / abandoned |
| Battery storage project AH1-600, Lee County Battery storage |
110 MW | Withdrawn / abandoned |
| Wood Street Battery Storage Battery storage · Wood Street Battery Storage LLC |
110 MW | Withdrawn / abandoned |
| Solar project 2021-G1 Solar |
110 MW | Withdrawn / abandoned |
| Solar project GEN-2021-062, Lea County Solar |
110 MW | Withdrawn / abandoned |
| Solar + storage project IC-941, Perry County Solar + storage |
110 MW | Withdrawn / abandoned |
| Solar project AH1-550, Licking County Solar |
110 MW | Withdrawn / abandoned |
| Battery storage project AH1-598, Ashland County Battery storage |
110 MW | Withdrawn / abandoned |
| Solar project AH1-597, Ashland County Solar |
110 MW | Withdrawn / abandoned |
| Solar project AH1-385, Greensville County Solar |
109 MW | Withdrawn / abandoned |
| Boa Vista Storage Battery storage |
109 MW | Withdrawn / abandoned |
| Battery Storage Battery storage |
108 MW | Withdrawn / abandoned |
| La Fuente Energy Storage Battery storage |
106 MW | Withdrawn / abandoned |
| Hemmings Storage Battery storage |
106 MW | Withdrawn / abandoned |
| Zietz Storage Battery storage |
106 MW | Withdrawn / abandoned |
| Battery Storage Battery storage |
105 MW | Withdrawn / abandoned |
| Tower 1 Energy Storage Battery storage |
105 MW | Withdrawn / abandoned |
| Battery Storage Battery storage |
105 MW | Withdrawn / abandoned |
| Aggie Energy storage Battery storage · KINGFISHER ENERGY STORAGE LLC |
104 MW | Withdrawn / abandoned |
| Solar Solar |
103 MW | Withdrawn / abandoned |
| Ghost Town Storage 2 Other · Ghost Town Storage 2 LLC |
103 MW | Withdrawn / abandoned |
| Ghost Town Storage 1 Other · Ghost Town Storage 1 LLC |
103 MW | Withdrawn / abandoned |
| Stirling Bridge 2 Es Battery storage |
103 MW | Withdrawn / abandoned |
| Bremen Solar Solar · New Bremen Solar |
102 MW | Withdrawn / abandoned |
| Ranger Battery storage |
102 MW | Withdrawn / abandoned |
| North Bay Energy Storage 2 Battery storage |
102 MW | Withdrawn / abandoned |
| Solar project GEN-2021-106, Thayer County Solar |
102 MW | Withdrawn / abandoned |
| Taylor Storage Battery storage |
102 MW | Withdrawn / abandoned |
| Estrada Storage Battery storage |
102 MW | Withdrawn / abandoned |
| White Wing II Energy Storage Other · White Wing II Energy Storage LLC |
102 MW | Withdrawn / abandoned |
| White Wing I Energy Storage Other · White Wing I Energy Storage LLC |
102 MW | Withdrawn / abandoned |
| Aurum Mine Battery storage |
102 MW | Withdrawn / abandoned |
| Fife Battery storage |
102 MW | Withdrawn / abandoned |
| Ocee Creek Solar Solar · OCI LoneSun LLC |
102 MW | Withdrawn / abandoned |
| Callisto II Energy Center Other · Saracen II Energy Storage LLC |
102 MW | Withdrawn / abandoned |
| Hanson Storage Battery storage · Hanson Solar, LLC |
101 MW | Withdrawn / abandoned |
| Solar Solar |
101 MW | Withdrawn / abandoned |
| Solar Solar |
101 MW | Withdrawn / abandoned |
| Elbrus Energy Storage Battery storage |
101 MW | Withdrawn / abandoned |
| Sheath Storage Battery storage |
101 MW | Withdrawn / abandoned |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
- CAISO (California)220 · 82.8 GW
- West (non-ISO utilities)339 · 78.3 GW
- PJM (Mid-Atlantic, Midwest)819 · 65.0 GW
- MISO (Midcontinent)267 · 38.5 GW
- NYISO (New York)149 · 23.5 GW
- Southeast (non-ISO utilities)123 · 16.3 GW
- ERCOT (Texas)77 · 13.4 GW
- SPP (Southwest Power Pool)70 · 13.1 GW
- ISO-NE (New England)85 · 8,317 MW
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines · Planned power plants (EIA)