United States β€Ί Grid β€Ί Interconnection queues β€Ί Mississippi

SOLAR + STORAGE Β· SOUTHEAST

Solar + storage project IC-941, Perry County

Solar + storage project IC-941, Perry County is a 110 MW solar + storage request withdrawn in the Southeast interconnection queue, in Perry County, Mississippi, connecting to Southern Company.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Mar 2021 (completed)
  2. Withdrawn / abandonedMar 2025 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
IC-941
Grid region
Southeast (non-ISO utilities)
Utility / transmission owner
Southern Company
Connection point (POI)
Eaton - Lucedale 115 kV Line
Location
Perry County, Mississippi
Technology
Solar: 110 MW Β· Battery
Total requested
110 MW
Service type
Network resource (NRIS)
Study phase
Withdrawn
Queue status
Withdrawn
Entered queue
18 March 2021
Proposed online date
January 2024
Withdrawn
March 2025

Location

Marker shows the centre of Perry County; the queue data does not give exact sites.

Power plants in Mississippi Β· Transmission lines in Mississippi

Other requests in Perry County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem