United States › Grid › Interconnection queues › Mississippi

SOLAR + STORAGE · MISO

Solar + storage project J3028, Perry County

Solar + storage project J3028, Perry County is a 100 MW solar + storage request in interconnection study in the MISO interconnection queue, in Perry County, Mississippi, connecting to COOPERATIVE ENERGY.

Queue statusIn planning
  1. PlanningQueued Sep 2022 (current stage)
  2. Consented (not yet reached)
  3. Construction (not yet reached)
  4. OperatingTarget Jun 2027 (not yet reached)
  5. Closed (not yet reached)

Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.

Request details

Queue ID
J3028
Grid region
MISO (Midcontinent)
Utility / transmission owner
COOPERATIVE ENERGY
Connection point (POI)
Waynesboro 161 - Hintonville 161 161.0kV
Location
Perry County, Mississippi
Technology
Solar: 100 MW · Battery
Total requested
100 MW
Service type
Network resource (NRIS)
Study phase
Study Phase: DPP 2; Post GIA Status: Not Started
Queue status
Active
Entered queue
14 September 2022
Proposed online date
June 2027

Location

Marker shows the centre of Perry County; the queue data does not give exact sites.

Power plants in Mississippi · Transmission lines in Mississippi

Other requests in Perry County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem