United States › Grid › Interconnection queues › Mississippi
SOLAR · MISOSolar project J2999, Perry County
Solar project J2999, Perry County is a 250 MW solar request in interconnection study in the MISO interconnection queue, in Perry County, Mississippi, connecting to COOPERATIVE ENERGY.
- PlanningQueued Sep 2022 (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- OperatingTarget Sep 2025 (not yet reached)
- Closed (not yet reached)
Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.
Request details
- Queue ID
- J2999
- Grid region
- MISO (Midcontinent)
- Utility / transmission owner
- COOPERATIVE ENERGY
- Connection point (POI)
- Hintonville
- Location
- Perry County, Mississippi
- Technology
- Solar: 250 MW
- Total requested
- 250 MW
- Service type
- Network resource (NRIS)
- Study phase
- Study Phase: DPP 2; Post GIA Status: Not Started
- Queue status
- Active
- Entered queue
- 15 September 2022
- Proposed online date
- September 2025
Location
Marker shows the centre of Perry County; the queue data does not give exact sites.
Power plants in Mississippi · Transmission lines in Mississippi
Other requests in Perry County
- Battery storage project J4083, Perry CountyBattery storage · 150 MW · in study
- Solar + storage project J3028, Perry CountySolar + storage · 100 MW · in study
- Battery storage project J2992, Perry CountyBattery storage · 160 MW · withdrawn
- Solar project IC-1089, Perry CountySolar · 125 MW · withdrawn
- Solar project J3915, Perry CountySolar · 125 MW · withdrawn
- Solar project IC-688, Perry CountySolar · 125 MW · withdrawn
- Solar project J3447, Perry CountySolar · 125 MW · withdrawn
- Solar project IC-1163, Perry CountySolar · 110 MW · withdrawn
- Solar + storage project IC-941, Perry CountySolar + storage · 110 MW · withdrawn
- Solar project J2980, Perry CountySolar · 100 MW · withdrawn
- Solar + storage project 25-IC-1335, Perry CountySolar + storage · 80.0 MW · withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem