United States βΊ Grid βΊ Interconnection queues βΊ Mississippi
BATTERY STORAGE Β· MISOBattery storage project J2992, Perry County
Battery storage project J2992, Perry County is a 160 MW battery storage request withdrawn in the MISO interconnection queue, in Perry County, Mississippi, connecting to COOPERATIVE ENERGY.
Queue statusWithdrawn / abandoned
- PlanningQueued Sep 2022 (completed)
- Withdrawn / abandonedJul 2025 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- J2992
- Grid region
- MISO (Midcontinent)
- Utility / transmission owner
- COOPERATIVE ENERGY
- Connection point (POI)
- Hintonville 161kV Substation
- Location
- Perry County, Mississippi
- Technology
- Battery: 160 MW
- Total requested
- 160 MW
- Service type
- Network resource (NRIS)
- Study phase
- Study Phase: DPP 2; Post GIA Status: Not Started
- Queue status
- Withdrawn
- Entered queue
- 15 September 2022
- Proposed online date
- September 2025
- Withdrawn
- July 2025
Location
Marker shows the centre of Perry County; the queue data does not give exact sites.
Power plants in Mississippi Β· Transmission lines in Mississippi
Other requests in Perry County
- Solar project J2999, Perry CountySolar Β· 250 MW Β· in study
- Battery storage project J4083, Perry CountyBattery storage Β· 150 MW Β· in study
- Solar + storage project J3028, Perry CountySolar + storage Β· 100 MW Β· in study
- Solar project IC-1089, Perry CountySolar Β· 125 MW Β· withdrawn
- Solar project J3915, Perry CountySolar Β· 125 MW Β· withdrawn
- Solar project IC-688, Perry CountySolar Β· 125 MW Β· withdrawn
- Solar project J3447, Perry CountySolar Β· 125 MW Β· withdrawn
- Solar project IC-1163, Perry CountySolar Β· 110 MW Β· withdrawn
- Solar + storage project IC-941, Perry CountySolar + storage Β· 110 MW Β· withdrawn
- Solar project J2980, Perry CountySolar Β· 100 MW Β· withdrawn
- Solar + storage project 25-IC-1335, Perry CountySolar + storage Β· 80.0 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem