BATTERY STORAGE Β· MISO

Battery storage project J2992, Perry County

Battery storage project J2992, Perry County is a 160 MW battery storage request withdrawn in the MISO interconnection queue, in Perry County, Mississippi, connecting to COOPERATIVE ENERGY.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Sep 2022 (completed)
  2. Withdrawn / abandonedJul 2025 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
J2992
Grid region
MISO (Midcontinent)
Utility / transmission owner
COOPERATIVE ENERGY
Connection point (POI)
Hintonville 161kV Substation
Location
Perry County, Mississippi
Technology
Battery: 160 MW
Total requested
160 MW
Service type
Network resource (NRIS)
Study phase
Study Phase: DPP 2; Post GIA Status: Not Started
Queue status
Withdrawn
Entered queue
15 September 2022
Proposed online date
September 2025
Withdrawn
July 2025

Location

Marker shows the centre of Perry County; the queue data does not give exact sites.

Power plants in Mississippi Β· Transmission lines in Mississippi

Other requests in Perry County