SOLAR Β· MISO

Solar project J3915, Perry County

Solar project J3915, Perry County is a 125 MW solar request withdrawn in the MISO interconnection queue, in Perry County, Mississippi, connecting to COOPERATIVE ENERGY.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Oct 2024 (completed)
  2. Withdrawn / abandonedOct 2025 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
J3915
Grid region
MISO (Midcontinent)
Utility / transmission owner
COOPERATIVE ENERGY
Connection point (POI)
Purvis Bulk 161 - Hintonville 161 161.0kV
Location
Perry County, Mississippi
Technology
Solar: 125 MW
Total requested
125 MW
Service type
NRIS and ERIS
Queue status
Withdrawn
Entered queue
25 October 2024
Proposed online date
September 2030
Withdrawn
October 2025

Location

Marker shows the centre of Perry County; the queue data does not give exact sites.

Power plants in Mississippi Β· Transmission lines in Mississippi

Other requests in Perry County