United States β€Ί Grid β€Ί Interconnection queues β€Ί Mississippi

SOLAR + STORAGE Β· SOUTHEAST

Solar + storage project 25-IC-1335, Perry County

Solar + storage project 25-IC-1335, Perry County is a 80.0 MW solar + storage request withdrawn in the Southeast interconnection queue, in Perry County, Mississippi, connecting to Southern Company.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Apr 2025 (completed)
  2. Withdrawn / abandonedDec 2025 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
25-IC-1335
Grid region
Southeast (non-ISO utilities)
Utility / transmission owner
Southern Company
Connection point (POI)
Eaton - Lucedale 115 kV Line
Location
Perry County, Mississippi
Technology
Solar: 80.0 MW Β· Battery
Total requested
80.0 MW
Service type
Energy only (ERIS)
Study phase
Withdrawn
Queue status
Withdrawn
Entered queue
12 April 2025
Withdrawn
December 2025

Location

Marker shows the centre of Perry County; the queue data does not give exact sites.

Power plants in Mississippi Β· Transmission lines in Mississippi

Other requests in Perry County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem