Queue requests in study in PJM (Mid-Atlantic, Midwest) — page 12

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown905105.4 GW
Active in queue140.4 GW1,248 requests
Agreement signed35.0 GW343 requests
Withdrawn5,226638.1 GW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

905 requests · page 12 of 19
ProjectCapacityStatusLocationRegionQueuedOnline
Solar project AI2-151, Logan County
Solar
48.0 MWIn study Logan, ILPJM Feb 2023target 2025
Solar project AI2-162, Whitley County
Solar
48.0 MWIn study Whitley, INPJM Mar 2023target 2025
Solar project AI2-417, Dekalb County
Solar
48.0 MWIn study Dekalb, ILPJM Mar 2023target 2026
Solar + storage project AH2-346, Hancock County
Solar + storage
47.5 MWIn study Hancock, OHPJM Mar 2022target 2025
Gardenia
Solar + storage · Gardenia Solar, LLC
46.5 MWIn study Clarion, PAPJM Feb 2025target 2024
Solar project AI1-011, Cumberland County
Solar
46.0 MWIn study Cumberland, VAPJM Apr 2022target 2026
South Branch Solar
Solar
46.0 MWPaused / redesign Hancock, OHPJM Jul 2020target 2025
Solar + storage project AH2-242, Montgomery County
Solar + storage
45.0 MWIn study Montgomery, OHPJM Mar 2022target 2027
Battery storage project AH2-241, City Of Chesapeake County
Battery storage
45.0 MWIn study City Of Chesapeake, VAPJM Mar 2022target 2027
Gas project AH2-269A, Prince George's County
Gas
45.0 MWIn study Prince George's, MDPJM Mar 2022target 2026
Battery storage project AI2-277, Greensville County
Battery storage
45.0 MWIn study Greensville, VAPJM Mar 2023target 2026
Solar + storage project AH2-344, Marion County
Solar + storage
45.0 MWIn study Marion, OHPJM Mar 2022target 2025
Solar project AH2-166, Fulton County
Solar
45.0 MWIn study Fulton, OHPJM Mar 2022target 2025
Solar project AI2-150, Huntington County
Solar
44.4 MWIn study Huntington, INPJM Feb 2023target 2025
Solar + storage project AH2-028, Pickaway County
Solar + storage
44.0 MWIn study Pickaway, OHPJM Nov 2021target 2025
Solar project AI2-159, Miami County
Solar
43.5 MWIn study Miami, OHPJM Mar 2023target 2027
Solar project AI2-421, Dekalb County
Solar
43.2 MWIn study Dekalb, INPJM Mar 2023target 2027
Solar project AI2-426, Allen County
Solar
43.2 MWIn study Allen, INPJM Mar 2023target 2027
Vinton Energy Storage
Battery storage
42.0 MWPaused / redesign Vinton, OHPJM Aug 2018target 2026
Amelia Energy Facility
Solar · Amelia Energy Facility, LLC
41.0 MWIn study Amelia, VAPJM Sep 2019target 2022
Solar project AI2-079, Fauquier County
Solar
40.7 MWIn study Fauquier, VAPJM Feb 2023target 2025
Solar project AI2-060, Henry County
Solar
40.7 MWIn study Henry, ILPJM Feb 2023target 2024
Solar project AI2-475, Montour County
Solar
40.6 MWIn study Montour, PAPJM Mar 2023target 2026
Ho-Fel Solar
Solar
40.0 MWPaused / redesign Isle Of Wight, VAPJM Sep 2018target 2026
Solar + storage project AH1-098, Carroll County
Solar + storage · Pine Branch Solar, LLC
40.0 MWIn study Carroll, VAPJM Jul 2025target 2025
Solar project AH2-156, Huron County
Solar
40.0 MWIn study Huron, OHPJM Mar 2022target 2025
Solar project AG2-109, Huron County
Solar · Rosemary Solar, LLC
40.0 MWIn study Huron, OHPJM Feb 2025target 2023
Solar project AH2-009, Morrow County
Solar
40.0 MWIn study Morrow, OHPJM Oct 2021target 2024
Solar + storage project AH2-045, Mecklenburg County
Solar + storage
40.0 MWIn study Mecklenburg, VAPJM Dec 2021target 2025
Poseidon Solar 1
Solar · Poseidon Energy, LLC
40.0 MWIn study Fayette, PAPJM Feb 2025target 2024
Gas project AI1-192, Marion County
Gas
40.0 MWIn study Marion, WVPJM Sep 2022target 2024
Woodstock Solar
Solar
40.0 MWPaused / redesign Champaign, OHPJM Mar 2019target 2026
Solar project AI2-333, Pike County
Solar
40.0 MWIn study Pike, KYPJM Mar 2023target 2026
Golden Aster Solar Energy Center
Battery storage
40.0 MWPaused / redesign Grant, INPJM Mar 2019target 2026
Battery storage project AI2-007, Kane County
Battery storage
40.0 MWIn study Kane, ILPJM Nov 2022target 2027
Henry County Solar
Solar
40.0 MWPaused / redesign Henry, OHPJM Sep 2019target 2026
Solar project AI2-332, Nicholas County
Solar
40.0 MWIn study Nicholas, WVPJM Mar 2023target 2030
Solar project AI2-425, Huntington County
Solar
40.0 MWIn study Huntington, INPJM Mar 2023target 2028
Solar project AH2-295, Greene County
Solar
40.0 MWIn study Greene, PAPJM Mar 2022target 2025
Solar project AH1-271, Bertie County
Solar · Merry Hill PV I, LLC
40.0 MWIn study Bertie, NCPJM Feb 2025target 2024
Solar project AH1-004, Fayette County
Solar · SR Fayette, LLC
40.0 MWIn study Fayette, KYPJM Mar 2025target 2023
Solar + storage project AJ1-018, Worcester County
Solar + storage
39.0 MWIn study Worcester, MDPJM Jun 2023target 2028
Battery storage project AG2-290, Seneca County
Battery storage · Chinchilla Solar LLC
38.4 MWIn study Seneca, OHPJM Feb 2025target 2024
Gas project AH1-718, Lee County
Gas · Invenergy Nelson Expansion LLC
38.0 MWIn study Lee, ILPJM Apr 2025
Solar project AG2-074, Carbon County
Solar · Plainfield Solar, LLC
38.0 MWIn study Carbon, PAPJM Feb 2025target 2023
Solar project AI2-014, Kankakee County
Solar
37.9 MWIn study Kankakee, ILPJM Nov 2022target 2026
Solar project AI1-118, Warren County
Solar
37.6 MWIn study Warren, NJPJM Sep 2022target 2025
Solar + storage project AH2-268, Dinwiddie County
Solar + storage
37.0 MWIn study Dinwiddie, VAPJM Mar 2022target 2025
Solar project AH2-129, Armstrong County
Solar
36.0 MWIn study Armstrong, PAPJM Mar 2022target 2026
Solar project AI2-144, St. Joseph County
Solar
36.0 MWIn study St. Joseph, MIPJM Feb 2023target 2025
Page 12 of 19

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines · Planned power plants (EIA)