United States › Grid › Interconnection queues › Texas
OCTARY USA · INTERCONNECTION QUEUESQueue requests in study in Texas — page 10
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| Onshore wind project GEN-2024-042, Floyd County Onshore wind |
250 MW | In study |
| Solar project GEN-2024-153, Randall County Solar |
250 MW | In study |
| Onshore wind project GEN-2024-041, Floyd County Onshore wind |
250 MW | In study |
| Battery storage project GEN-2024-368, Gray County Battery storage |
250 MW | In study |
| Onshore wind project GEN-2024-145, Dallam County Onshore wind |
250 MW | In study |
| Onshore wind project GEN-2024-143, Dallam County Onshore wind |
250 MW | In study |
| Battery storage project ERAS-2025-027, Yoakum County Battery storage |
250 MW | In study |
| Cascade Storage Battery storage |
250 MW | Paused / redesign |
| Iguala Solar Solar |
250 MW | Paused / redesign |
| Grandview 5 W Onshore wind · Eon |
249 MW | Paused / redesign |
| Straight Spur Wind Onshore wind · ENGIE IR Holdings LLC |
247 MW | In study |
| Bluewind BESS Battery storage · Bluewind Energy Center, LLC |
247 MW | In study |
| Hill Valley BESS Battery storage · Hill Valley BESS, LLC |
246 MW | In study |
| Mojo BESS Solar + storage · Power Synergy |
246 MW | In study |
| Apricot Sun Solar Solar + storage · Apricot Sun Energy Center, LLC |
246 MW | In study |
| Dempsey Solar SLF Solar + storage · Dempsey Solar LLC |
245 MW | In study |
| Morada Del Sol Solar Solar · First Solar |
245 MW | Paused / redesign |
| Gail Mountain Solar Solar · Gail Mountain Solar, LLC |
244 MW | In study |
| Brazos Bend Solar SLF Solar + storage · Grenergy USA |
243 MW | In study |
| Brazos Bend Storage SLF Solar + storage · Grenergy USA |
243 MW | In study |
| Lutum Wind Onshore wind · RWE |
242 MW | In study |
| Diaz BESS Battery storage · BRP Blue Topaz 10, LLC |
242 MW | In study |
| Best Southwest BESS Battery storage |
241 MW | Paused / redesign |
| Easy Wind Energy Center Wind + storage · Easy Wind Energy Center, LLC |
241 MW | In study |
| Jane Storage Energy Center Battery storage · NMRE Holdings, LLC |
241 MW | In study |
| Giddings Wind Onshore wind · Pioneer Natural Resources |
240 MW | In study |
| Solar + storage project J3985, Polk County Solar + storage |
240 MW | In study |
| Razorbill Solar Solar + storage · RWE Solar Development, LLC |
240 MW | In study |
| Camino Ranch Storage 2 SLF Solar + storage · Camino Ranch Solar LLC |
239 MW | In study |
| Campsey Wind Onshore wind · RWE Clean Energy Development, LLC |
238 MW | In study |
| Camino Ranch Solar 2 SLF Solar + storage · Camino Ranch Solar Project LLC |
237 MW | In study |
| DeSpain Solar Project Solar · Gransolar Texas Thirteen LLC |
236 MW | In study |
| Kuy Creek Solar 1 SLF Solar + storage · Kuy Creek Solar 1 LLC |
235 MW | In study |
| Bora Bora Solar Solar |
233 MW | Paused / redesign |
| Gas project ERAS-2025-016, Lamb County Gas |
233 MW | In study |
| Cricket Storage Battery storage · Cricket Storage, LLC |
232 MW | In study |
| Petunia Storage Project Battery storage · Petunia Storage Project LLC |
232 MW | In study |
| Larrea Solar Solar · Greasewood IV LLC |
232 MW | In study |
| Allthorn Solar Solar + storage · ALLTHORN SOLAR, LLC |
232 MW | In study |
| Rio Grand Valley Element Fuels Power Other · Element H2Gen, LLC |
230 MW | In study |
| Rubicon Echo Wind Onshore wind |
228 MW | Paused / redesign |
| GridGuardian BESS Battery storage · SMT Temple BESS LLC |
228 MW | In study |
| Pluto Solar Solar |
228 MW | Paused / redesign |
| Houston BESS Battery storage · SMT Houston |
228 MW | In study |
| White Tail Solar Solar · Mule Deer Solar LLC |
227 MW | In study |
| Gulf Wind 2 Onshore wind |
227 MW | Paused / redesign |
| Dunkel BESS Battery storage · Momentum Energy Storage Partners |
226 MW | In study |
| Sim Gideon Gas Rice Gas · LCRA |
226 MW | In study |
| Cedar Draw BESS Solar + storage · Cedar Draw Solar LLC |
226 MW | In study |
| Aquilla Lake 3 Wind (Alternative POI Oncor 138KV) Onshore wind |
226 MW | Paused / redesign |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
- ERCOT (Texas)1,398 · 327.9 GW
- SPP (Southwest Power Pool)61 · 16.6 GW
- MISO (Midcontinent)22 · 6,012 MW
- West (non-ISO utilities)5 · 997 MW
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines · Planned power plants (EIA)