Key facts
- Installed capacity
- 3.92 MW
- Status
- Operational
- Technology
- Solar Β· PV
- Operator
- Anesco
- Region
- South East
- Country
- England
- Grid connection (DUKES)
- LV
- Combined heat & power
- No
- Postcode
- RG26 5AT
- Coordinates
- 51.3287, -1.1124
Location
Map position from the published coordinates. For small sites this can be an approximate point rather than the exact boundary. Map Β© OpenStreetMap contributors.
How Berry Court compares
At a typical UK load factor for this technology (about 10% of the maximum possible output), a 3.92 MW station would generate roughly 3.4 GWh of electricity in a year, similar to the annual use of about 1,270 homes at 2,700 kWh each. This is an illustrative estimate, not the station's metered output: real generation varies with weather, availability and grid constraints.
Solar photovoltaic (PV) sites generate electricity from sunlight. Panels produce direct current, which inverters convert to alternating current for the grid. Output follows daylight and the seasons, so annual generation is a small fraction of the maximum possible.
All UK solar farms Solar farms in South East All run by AnescoNearby generating sites
- Hill End Farm Β· 2.84 MW solar farm1.9 km
- Burghfield Β· 50 MW open-cycle gas power station8.7 km
- Pierces Farm Β· 1.74 MW solar farm10.2 km
- Limberlost Β· 1.59 MW solar farm10.2 km
- Sheepbridge Β· 5 MW solar farm11.8 km
- Pingewood Β· 15.4 MW solar farm12.8 km
- Green Park Β· 2 MW onshore wind farm13.4 km
- Overton Β· 3.75 MW solar farm14.4 km
Also operated by Anesco
Anesco operates 136 sites in the register. Largest first:
Planning history
From the government's Renewable Energy Planning Database (REPD), matched to this site by location, capacity and name.
- Planning status
- Operational
- Site name in planning record
- Berry Court Farm
- Developer / operator
- Green Switch Solutions - SOLD
- Planning authority
- Basingstoke and Deane
- Planning reference
- 14/02338/FUL
- Application submitted
- 27 August 2014
- Permission granted
- 23 April 2015
- Construction started
- 1 October 2016
- Began operating
- 1 December 2016
- Capacity in planning record
- 4.2 MW
- Address
- Berry Court Farm, New Road, Little London, Tadley, Hampshire, RG26 5EU
- REPD reference
- 2150
Source
Department for Energy Security and Net Zero (DESNZ), Digest of UK Energy Statistics (DUKES), table 5.11: power stations in the United Kingdom β operational at end of May 2025.
Capacity is installed capacity as published, not current output. Status reflects the source date, not live operation.
View the original source
Last checked by Octary: 15 July 2026
Spotted an error? Tell us and we will check it against the source.