SOLAR Β· OPERATIONAL

Berry Court

Berry Court is a 3.92 MW solar farm in South East England, operated by Anesco. The UK government lists it as operational in its register of power stations (DUKES table 5.11, May 2025).

  • PV
  • South East
  • England
Project stageOperating
  1. PlanningAug 2014 (completed)
  2. ConsentedApr 2015 (completed)
  3. ConstructionOct 2016 (completed)
  4. OperatingDec 2016 (current stage)
  5. Closed (not yet reached)

Planning dates from the Renewable Energy Planning Database; operating status from DUKES table 5.11.

Key facts

Installed capacity
3.92 MW
Status
Operational
Technology
Solar Β· PV
Operator
Anesco
Region
South East
Country
England
Grid connection (DUKES)
LV
Combined heat & power
No
Postcode
RG26 5AT
Coordinates
51.3287, -1.1124

Location

Map position from the published coordinates. For small sites this can be an approximate point rather than the exact boundary. Map Β© OpenStreetMap contributors.

How Berry Court compares

534th of 662largest solar farms in the UK register
88th of 105in South East
0.07%of listed UK solar farms capacity
β‰ˆ 3.4 GWhillustrative output a year

At a typical UK load factor for this technology (about 10% of the maximum possible output), a 3.92 MW station would generate roughly 3.4 GWh of electricity in a year, similar to the annual use of about 1,270 homes at 2,700 kWh each. This is an illustrative estimate, not the station's metered output: real generation varies with weather, availability and grid constraints.

Solar photovoltaic (PV) sites generate electricity from sunlight. Panels produce direct current, which inverters convert to alternating current for the grid. Output follows daylight and the seasons, so annual generation is a small fraction of the maximum possible.

All UK solar farms Solar farms in South East All run by Anesco

Planning history

From the government's Renewable Energy Planning Database (REPD), matched to this site by location, capacity and name.

Planning status
Operational
Site name in planning record
Berry Court Farm
Developer / operator
Green Switch Solutions - SOLD
Planning authority
Basingstoke and Deane
Planning reference
14/02338/FUL
Application submitted
27 August 2014
Permission granted
23 April 2015
Construction started
1 October 2016
Began operating
1 December 2016
Capacity in planning record
4.2 MW
Address
Berry Court Farm, New Road, Little London, Tadley, Hampshire, RG26 5EU
REPD reference
2150

Source

Department for Energy Security and Net Zero (DESNZ), Digest of UK Energy Statistics (DUKES), table 5.11: power stations in the United Kingdom β€” operational at end of May 2025. Capacity is installed capacity as published, not current output. Status reflects the source date, not live operation.
View the original source
Last checked by Octary: 15 July 2026

Spotted an error? Tell us and we will check it against the source.