Siddington
Siddington is a 20.9 MW solar farm in South West England, operated by Anesco. The UK government lists it as operational in its register of power stations (DUKES table 5.11, May 2025).
- PV
- South West
- England
Key facts
- Installed capacity
- 20.9 MW
- Status
- Operational
- Technology
- Solar Β· PV
- Operator
- Anesco
- Region
- South West
- Country
- England
- Grid connection (DUKES)
- HV
- Combined heat & power
- No
- Postcode
- GL7 6DB
Location
No coordinates are published for this station.
How Siddington compares
At a typical UK load factor for this technology (about 10% of the maximum possible output), a 20.9 MW station would generate roughly 18 GWh of electricity in a year, similar to the annual use of about 6,770 homes at 2,700 kWh each. This is an illustrative estimate, not the station's metered output: real generation varies with weather, availability and grid constraints.
Solar photovoltaic (PV) sites generate electricity from sunlight. Panels produce direct current, which inverters convert to alternating current for the grid. Output follows daylight and the seasons, so annual generation is a small fraction of the maximum possible.
All UK solar farms Solar farms in South West All run by AnescoAlso operated by Anesco
Anesco operates 136 sites in the register. Largest first:
Planning history
From the government's Renewable Energy Planning Database (REPD), matched to this site by location, capacity and name.
- Planning status
- Under Construction
- Site name in planning record
- Siddington Solar Farm
- Developer / operator
- Gresham House / Anesco Limited
- Planning authority
- Cotswold
- Planning reference
- 20/04499/FUL
- Application submitted
- 23 December 2020
- Permission granted
- 21 May 2021
- Capacity in planning record
- 19.9 MW
- Address
- E/O Ashton Road, Gloucestershire, GL7 6HR
- REPD reference
- 8257
Source
Department for Energy Security and Net Zero (DESNZ), Digest of UK Energy Statistics (DUKES), table 5.11: power stations in the United Kingdom β operational at end of May 2025.
Capacity is installed capacity as published, not current output. Status reflects the source date, not live operation.
View the original source
Last checked by Octary: 15 July 2026