Beavor Grange

Beavor Grange is a 19.5 MW solar farm in South West England, operated by Anesco. The UK government lists it as operational in its register of power stations (DUKES table 5.11, May 2025).

  • PV
  • South West
  • England
Project stageOperating
  1. PlanningNov 2021 (completed)
  2. ConsentedFeb 2022 (completed)
  3. ConstructionMar 2023 (completed)
  4. Operating (current stage)
  5. Closed (not yet reached)

Planning dates from the Renewable Energy Planning Database; operating status from DUKES table 5.11.

Key facts

Installed capacity
19.5 MW
Status
Operational
Technology
Solar Β· PV
Operator
Anesco
Region
South West
Country
England
Grid connection (DUKES)
HV
Combined heat & power
No
Postcode
EX13 5SE
Coordinates
50.7793, -2.9551

Location

Map position from the published coordinates. For small sites this can be an approximate point rather than the exact boundary. Map Β© OpenStreetMap contributors.

How Beavor Grange compares

56th of 662largest solar farms in the UK register
10th of 192in South West
0.35%of listed UK solar farms capacity
β‰ˆ 17 GWhillustrative output a year

At a typical UK load factor for this technology (about 10% of the maximum possible output), a 19.5 MW station would generate roughly 17 GWh of electricity in a year, similar to the annual use of about 6,340 homes at 2,700 kWh each. This is an illustrative estimate, not the station's metered output: real generation varies with weather, availability and grid constraints.

Solar photovoltaic (PV) sites generate electricity from sunlight. Panels produce direct current, which inverters convert to alternating current for the grid. Output follows daylight and the seasons, so annual generation is a small fraction of the maximum possible.

All UK solar farms Solar farms in South West All run by Anesco

Planning history

From the government's Renewable Energy Planning Database (REPD), matched to this site by location, capacity and name.

Planning status
Under Construction
Site name in planning record
Beavor - Photovoltaic Solar Arrays
Developer / operator
Anesco Limited / Gresham House
Planning authority
East Devon
Planning reference
21/2992/MFUL
Application submitted
17 November 2021
Permission granted
10 February 2022
Construction started
28 March 2023
Capacity in planning record
18.9 MW
Address
Beavor Grange Farm Axminster, Devon, EX13 5SE
REPD reference
10040

Source

Department for Energy Security and Net Zero (DESNZ), Digest of UK Energy Statistics (DUKES), table 5.11: power stations in the United Kingdom β€” operational at end of May 2025. Capacity is installed capacity as published, not current output. Status reflects the source date, not live operation.
View the original source
Last checked by Octary: 15 July 2026

Spotted an error? Tell us and we will check it against the source.