Beavor Grange
Beavor Grange is a 19.5 MW solar farm in South West England, operated by Anesco. The UK government lists it as operational in its register of power stations (DUKES table 5.11, May 2025).
- PV
- South West
- England
Key facts
- Installed capacity
- 19.5 MW
- Status
- Operational
- Technology
- Solar Β· PV
- Operator
- Anesco
- Region
- South West
- Country
- England
- Grid connection (DUKES)
- HV
- Combined heat & power
- No
- Postcode
- EX13 5SE
- Coordinates
- 50.7793, -2.9551
Location
Map position from the published coordinates. For small sites this can be an approximate point rather than the exact boundary. Map Β© OpenStreetMap contributors.
How Beavor Grange compares
At a typical UK load factor for this technology (about 10% of the maximum possible output), a 19.5 MW station would generate roughly 17 GWh of electricity in a year, similar to the annual use of about 6,340 homes at 2,700 kWh each. This is an illustrative estimate, not the station's metered output: real generation varies with weather, availability and grid constraints.
Solar photovoltaic (PV) sites generate electricity from sunlight. Panels produce direct current, which inverters convert to alternating current for the grid. Output follows daylight and the seasons, so annual generation is a small fraction of the maximum possible.
All UK solar farms Solar farms in South West All run by AnescoNearby generating sites
- Newlands Β· 4.28 MW solar farm0.8 km
- Wyld Meadow Farm Solar Park Β· 4.84 MW solar farm1.4 km
- Stonebarrow Β· 7.49 MW solar farm2.2 km
- Chard Β· 3.04 MW solar farm11.9 km
- Parsonage (Hazel) Β· 7 MW solar farm17.8 km
- North Perrott Fruit Farm Β· 0.82 MW solar farm18.2 km
- Hurcott Β· 10 MW solar farm18.7 km
- Blackdown Β· 7.45 MW solar farm20.3 km
Also operated by Anesco
Anesco operates 136 sites in the register. Largest first:
Planning history
From the government's Renewable Energy Planning Database (REPD), matched to this site by location, capacity and name.
- Planning status
- Under Construction
- Site name in planning record
- Beavor - Photovoltaic Solar Arrays
- Developer / operator
- Anesco Limited / Gresham House
- Planning authority
- East Devon
- Planning reference
- 21/2992/MFUL
- Application submitted
- 17 November 2021
- Permission granted
- 10 February 2022
- Construction started
- 28 March 2023
- Capacity in planning record
- 18.9 MW
- Address
- Beavor Grange Farm Axminster, Devon, EX13 5SE
- REPD reference
- 10040
Source
Department for Energy Security and Net Zero (DESNZ), Digest of UK Energy Statistics (DUKES), table 5.11: power stations in the United Kingdom β operational at end of May 2025.
Capacity is installed capacity as published, not current output. Status reflects the source date, not live operation.