Stonebarrow
Stonebarrow is a 7.49 MW solar farm in South West England, operated by Greencoat Capital. The UK government lists it as operational in its register of power stations (DUKES table 5.11, May 2025).
- PV
- South West
- England
Key facts
- Installed capacity
- 7.49 MW
- Status
- Operational
- Technology
- Solar Β· PV
- Operator
- Greencoat Capital
- Region
- South West
- Country
- England
- Grid connection (DUKES)
- LV
- Combined heat & power
- No
- Postcode
- EX13 5UL
- Coordinates
- 50.7855, -2.9249
Location
Map position from the published coordinates. For small sites this can be an approximate point rather than the exact boundary. Map Β© OpenStreetMap contributors.
How Stonebarrow compares
At a typical UK load factor for this technology (about 10% of the maximum possible output), a 7.49 MW station would generate roughly 6.6 GWh of electricity in a year, similar to the annual use of about 2,430 homes at 2,700 kWh each. This is an illustrative estimate, not the station's metered output: real generation varies with weather, availability and grid constraints.
Solar photovoltaic (PV) sites generate electricity from sunlight. Panels produce direct current, which inverters convert to alternating current for the grid. Output follows daylight and the seasons, so annual generation is a small fraction of the maximum possible.
All UK solar farms Solar farms in South West All run by Greencoat CapitalNearby generating sites
- Wyld Meadow Farm Solar Park Β· 4.84 MW solar farm1.0 km
- Beavor Grange Β· 19.5 MW solar farm2.2 km
- Newlands Β· 4.28 MW solar farm2.3 km
- Chard Β· 3.04 MW solar farm11.2 km
- North Perrott Fruit Farm Β· 0.82 MW solar farm16.1 km
- Parsonage (Hazel) Β· 7 MW solar farm16.8 km
- Hurcott Β· 10 MW solar farm17.4 km
- Blackdown Β· 7.45 MW solar farm21.2 km
Also operated by Greencoat Capital
Greencoat Capital operates 195 sites in the register. Largest first:
Planning history
From the government's Renewable Energy Planning Database (REPD), matched to this site by location, capacity and name.
- Planning status
- Operational
- Site name in planning record
- Stonebarrow Farm
- Developer / operator
- British Solar Renewables (formerly known as Solar Power Generation)
- Planning authority
- East Devon
- Planning reference
- 12/2410/MFUL
- Application submitted
- 9 November 2012
- Permission granted
- 19 April 2013
- Began operating
- 30 January 2014
- Capacity in planning record
- 8 MW
- Address
- Land Opposite Woodcote National Substation Hawkchurch Devon, Devon, EX13 5RX
- REPD reference
- 2064
Source
Department for Energy Security and Net Zero (DESNZ), Digest of UK Energy Statistics (DUKES), table 5.11: power stations in the United Kingdom β operational at end of May 2025.
Capacity is installed capacity as published, not current output. Status reflects the source date, not live operation.
View the original source
Last checked by Octary: 15 July 2026
Spotted an error? Tell us and we will check it against the source.