SOLAR Β· OPERATIONAL

Eveley

Eveley is a 49.3 MW solar farm in South East England, operated by Greencoat Capital. The UK government lists it as operational in its register of power stations (DUKES table 5.11, May 2025).

  • PV
  • South East
  • England
Project stageOperating
  1. PlanningFeb 2015 (completed)
  2. ConsentedJul 2015 (completed)
  3. ConstructionMar 2016 (completed)
  4. OperatingMar 2016 (current stage)
  5. Closed (not yet reached)

Planning dates from the Renewable Energy Planning Database; operating status from DUKES table 5.11.

Key facts

Installed capacity
49.3 MW
Status
Operational
Technology
Solar Β· PV
Operator
Greencoat Capital
Region
South East
Country
England
Grid connection (DUKES)
LV
Combined heat & power
No
Postcode
SO20 6SA
Coordinates
51.0978, -1.5328

Location

Map position from the published coordinates. For small sites this can be an approximate point rather than the exact boundary. Map Β© OpenStreetMap contributors.

How Eveley compares

15th of 662largest solar farms in the UK register
3rd of 105in South East
0.87%of listed UK solar farms capacity
β‰ˆ 43 GWhillustrative output a year

At a typical UK load factor for this technology (about 10% of the maximum possible output), a 49.3 MW station would generate roughly 43 GWh of electricity in a year, similar to the annual use of about 16,000 homes at 2,700 kWh each. This is an illustrative estimate, not the station's metered output: real generation varies with weather, availability and grid constraints.

Solar photovoltaic (PV) sites generate electricity from sunlight. Panels produce direct current, which inverters convert to alternating current for the grid. Output follows daylight and the seasons, so annual generation is a small fraction of the maximum possible.

All UK solar farms Solar farms in South East All run by Greencoat Capital

Planning history

From the government's Renewable Energy Planning Database (REPD), matched to this site by location, capacity and name.

Planning status
Operational
Site name in planning record
Eveley Farm
Developer / operator
PS Renewables
Planning authority
Test Valley
Planning reference
15/00094/FULLS
Application submitted
16 February 2015
Permission granted
27 July 2015
Construction started
1 March 2016
Began operating
17 March 2016
Capacity in planning record
49 MW
Address
Land At Eveley Farm Stevens Drove Houghton Stockbridge, Hampshire, SO20 6SA
REPD reference
5080

Source

Department for Energy Security and Net Zero (DESNZ), Digest of UK Energy Statistics (DUKES), table 5.11: power stations in the United Kingdom β€” operational at end of May 2025. Capacity is installed capacity as published, not current output. Status reflects the source date, not live operation.
View the original source
Last checked by Octary: 15 July 2026

Spotted an error? Tell us and we will check it against the source.