Fullerton
Fullerton is a 4.36 MW solar farm in South East England, operated by Octopus Investments. The UK government lists it as operational in its register of power stations (DUKES table 5.11, May 2025).
- PV
- South East
- England
Key facts
- Installed capacity
- 4.36 MW
- Status
- Operational
- Technology
- Solar Β· PV
- Operator
- Octopus Investments
- Region
- South East
- Country
- England
- Grid connection (DUKES)
- LV
- Combined heat & power
- No
- Postcode
- SP11 7HR
- Coordinates
- 51.1723, -1.4714
Location
Map position from the published coordinates. For small sites this can be an approximate point rather than the exact boundary. Map Β© OpenStreetMap contributors.
How Fullerton compares
At a typical UK load factor for this technology (about 10% of the maximum possible output), a 4.36 MW station would generate roughly 3.8 GWh of electricity in a year, similar to the annual use of about 1,410 homes at 2,700 kWh each. This is an illustrative estimate, not the station's metered output: real generation varies with weather, availability and grid constraints.
Solar photovoltaic (PV) sites generate electricity from sunlight. Panels produce direct current, which inverters convert to alternating current for the grid. Output follows daylight and the seasons, so annual generation is a small fraction of the maximum possible.
All UK solar farms Solar farms in South East All run by Octopus InvestmentsNearby generating sites
- Westover Β· 7.04 MW solar farm2.7 km
- Owls Lodge Β· 10 MW solar farm6.9 km
- Eveley Β· 49.3 MW solar farm9.3 km
- Lains Farm Β· 4.54 MW solar farm10.2 km
- Shipton Bellinger Β· 5.43 MW solar farm13.8 km
- Parkhouse Β· 6.64 MW solar farm14.4 km
- Overton Β· 3.75 MW solar farm16.1 km
- Hale Farm Solar Ltd Β· 12.2 MW solar farm17.9 km
Also operated by Octopus Investments
Octopus Investments operates 134 sites in the register. Largest first:
Source
Department for Energy Security and Net Zero (DESNZ), Digest of UK Energy Statistics (DUKES), table 5.11: power stations in the United Kingdom β operational at end of May 2025.
Capacity is installed capacity as published, not current output. Status reflects the source date, not live operation.
View the original source
Last checked by Octary: 15 July 2026
Spotted an error? Tell us and we will check it against the source.