Overton
Overton is a 3.75 MW solar farm in South East England, operated by Cubico Sustainable Investments. The UK government lists it as operational in its register of power stations (DUKES table 5.11, May 2025).
- PV
- South East
- England
Key facts
- Installed capacity
- 3.75 MW
- Status
- Operational
- Technology
- Solar Β· PV
- Operator
- Cubico Sustainable Investments
- Region
- South East
- Country
- England
- Grid connection (DUKES)
- LV
- Combined heat & power
- No
- Postcode
- RG25 3ES
- Coordinates
- 51.2514, -1.2778
Location
Map position from the published coordinates. For small sites this can be an approximate point rather than the exact boundary. Map Β© OpenStreetMap contributors.
How Overton compares
At a typical UK load factor for this technology (about 10% of the maximum possible output), a 3.75 MW station would generate roughly 3.3 GWh of electricity in a year, similar to the annual use of about 1,220 homes at 2,700 kWh each. This is an illustrative estimate, not the station's metered output: real generation varies with weather, availability and grid constraints.
Solar photovoltaic (PV) sites generate electricity from sunlight. Panels produce direct current, which inverters convert to alternating current for the grid. Output follows daylight and the seasons, so annual generation is a small fraction of the maximum possible.
All UK solar farms Solar farms in South East All run by Cubico Sustainable InvestmentsNearby generating sites
- Owls Lodge Β· 10 MW solar farm10.0 km
- Hill End Farm Β· 2.84 MW solar farm13.4 km
- Berry Court Β· 3.92 MW solar farm14.4 km
- Limberlost Β· 1.59 MW solar farm14.8 km
- Upper Farm Β· 10 MW solar farm15.6 km
- Fullerton Β· 4.36 MW solar farm16.1 km
- Westover Β· 7.04 MW solar farm18.8 km
- Bishops Sutton Β· 12 MW solar farm20.7 km
Also operated by Cubico Sustainable Investments
Cubico Sustainable Investments operates 18 sites in the register. Largest first:
Planning history
From the government's Renewable Energy Planning Database (REPD), matched to this site by location, capacity and name.
- Planning status
- Operational
- Developer / operator
- British Solar Renewables
- Planning authority
- Basingstoke and Deane
- Planning reference
- 14/01777/FUL
- Application submitted
- 17 June 2014
- Permission granted
- 18 December 2014
- Construction started
- 1 October 2015
- Began operating
- 15 December 2015
- Capacity in planning record
- 4 MW
- Address
- Land Adjoining Lordsfield Plantation, The Lynch, Overton, Hampshire, Hampshire
- REPD reference
- 1848
Source
Department for Energy Security and Net Zero (DESNZ), Digest of UK Energy Statistics (DUKES), table 5.11: power stations in the United Kingdom β operational at end of May 2025.
Capacity is installed capacity as published, not current output. Status reflects the source date, not live operation.
View the original source
Last checked by Octary: 15 July 2026
Spotted an error? Tell us and we will check it against the source.