WIND Β· OPERATIONAL

Middlewick

Middlewick is a 20.7 MW onshore wind farm in East of England, England, operated by Cubico Sustainable Investments. The UK government lists it as operational in its register of power stations (DUKES table 5.11, May 2025).

  • Onshore
  • East of England
  • England

Key facts

Installed capacity
20.7 MW
Status
Operational
Technology
Wind Β· Onshore
Operator
Cubico Sustainable Investments
Region
East of England
Country
England
Grid connection (DUKES)
LV
Combined heat & power
No
Postcode
CM0 7JQ
Coordinates
51.6631, 0.8925

Location

Map position from the published coordinates. For small sites this can be an approximate point rather than the exact boundary. Map Β© OpenStreetMap contributors.

How Middlewick compares

219th of 488largest wind farms in the UK register
16th of 48in East of England
0.07%of listed UK wind farms capacity
β‰ˆ 47 GWhillustrative output a year

At a typical UK load factor for this technology (about 26% of the maximum possible output), a 20.7 MW station would generate roughly 47 GWh of electricity in a year, similar to the annual use of about 17,460 homes at 2,700 kWh each. This is an illustrative estimate, not the station's metered output: real generation varies with weather, availability and grid constraints.

Wind farms turn the kinetic energy of the wind into electricity with turbines. Output varies with wind speed. Offshore sites usually see stronger, steadier winds than onshore sites and so generate more per MW of capacity.

All UK wind farms Wind farms in East of England All run by Cubico Sustainable Investments

Planning history

From the government's Renewable Energy Planning Database (REPD), matched to this site by location, capacity and name.

Planning status
Operational
Site name in planning record
Middlewick wind farm
Developer / operator
Blue Energy (formerly Ridgewind Ltd)
Planning authority
Maldon
Planning reference
10/00004/FUL
Application submitted
5 January 2010
Permission granted
1 May 2011
Construction started
4 June 2013
Began operating
31 July 2014
Capacity in planning record
20.7 MW
Address
Land Between Middlewick Farm And Wraywick Farm, The Marshes, Southminster, Essex, Essex
REPD reference
4662

Source

Department for Energy Security and Net Zero (DESNZ), Digest of UK Energy Statistics (DUKES), table 5.11: power stations in the United Kingdom β€” operational at end of May 2025. Capacity is installed capacity as published, not current output. Status reflects the source date, not live operation.
View the original source
Last checked by Octary: 15 July 2026

Spotted an error? Tell us and we will check it against the source.